Laserfiche WebLink
SECTION V <br />STRATEGY. REGULATION <br />No. <br />Policy <br />Target Audience <br />6 <br />The City may prohibit work in areas having steep or very steep <br />City <br />1 <br />slopes and high erosion potential where the impacts of significant <br />City <br />erosion cannot be protected against or mitigated in accordance with <br />2 <br />the City of St. Anthony erosion control ordinances. A copy of this <br />City <br />ordinance is included in Appendix _. <br />D. INTERNAL OPERATIONS <br />The City's internal operations can have a significant impact on storm water management. This <br />strategy is targeted primarily at the City with some areas targeted at the public and/or another <br />agency. These policies are aimed at operation and maintenance activities associated with <br />water resource management within the City. <br />STRATEGY. INTERNAL OPERATIONS <br />No. <br />Policy <br />Target <br />Audience <br />1 <br />The City will sweep the streets at least five times annually. Areas <br />City <br />that need more frequent sweeping will be swept as needed. <br />2 <br />The City will inspect storm water treatment basins at least every 5 <br />City <br />years and sump catch basins/manholes every year. Maintenance <br />will be conducted as necessary. <br />3 <br />The City prefers to use regional detention and treatment areas <br />City <br />rather than site specific detention areas where feasible. The City <br />recognizes that development of these areas will likely be <br />incorporated into development activity and not initiated <br />independently by the City. <br />4 <br />The City requires as-builts of all ponding areas and designated <br />City, Developer <br />emergency overflows. <br />City of St. Anthony Section V - Page 11 <br />WSB Project No. 1626-25 <br />August 2007 <br />39 <br />