My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 06242008
StAnthony
>
City Council
>
City Council Packets
>
2008
>
CC PACKET 06242008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2015 7:36:42 AM
Creation date
5/7/2014 2:16:14 PM
Metadata
Fields
Template:
City Council
Document Type
Council Agenda/Packets
Supplemental fields
City Code Chapter Amendment
Keywords
Missing
Ordinance #
Ordinance Summary
Ordinance Title
Planning File #
Property Address
Property PIN
Publication Newspaper
Publication Title
Publication Type
Resolution #
Resolution Summary
Resolution Title
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
54 <br />Vi F I n ,�' IFA. <br />}i <br />E C ,11"A . 1 t �:t_.7 <br />1. In an effort to quickly become familiar with the buildings, Sebesta Blomberg will request, review and <br />analyze building information per the attached data request form. <br />2. After receiving and reviewing the building data, Sebesta Blomberg will conduct an on-site facility walk- <br />through of cacti building to execute the following tasks: <br />a. Interview select operations and maintenance staff and energy management personnel to further <br />discuss and understand the facility and its current operational performance characteristics <br />b. Walk through the space to gain first-hand knowledge of the design and current operational <br />conditions of the facility <br />3. Sebesta Blomberg will create and present a final report that will include all recommendations for <br />replacement with special emphasis on building system performance and energy efficiency. <br />Deliverables <br />Sebesta Blomberg will prepare a final facility assessment report including: <br />1. An executive summary highlighting our general findings and recommendations <br />2. A mat ix of all ECOs (Energy Conservation Opportunities) that includes the following: <br />a. Description of tlme ECO <br />b. Estimated first costs associated with implementation of the ECO <br />c. Estimated energy and maintenance savings associated with the ECO <br />3. List of all design and operational issues discovered during the facility analysis including <br />recommendations for remediation <br />(Building Systems <br />Sebesta Blomberg proposes to provide the services as outlined above to the following building systems: <br />1. HVAC Systems including: packaged rooftop units, boilers and hydropic heating system, exhaust systems <br />and controls <br />2. Electrical Systems including normal electrical and lighting <br />3. Building envelope including windows and roof <br />Clarifications <br />This proposal is based on the following clarifications: <br />1. The depth of our analysis will be directly related to the Owner's ability to provide the facility data <br />requested with this proposal. All documentation required (as -built drawings, as -built sequence of <br />operations, TAB data, etc.) will be provided prior to the initial site visit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.