My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 02242009
StAnthony
>
City Council
>
City Council Packets
>
2009
>
CC PACKET 02242009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2015 7:19:21 AM
Creation date
5/7/2014 2:14:05 PM
Metadata
Fields
Template:
City Council
Document Type
Council Agenda/Packets
Supplemental fields
City Code Chapter Amendment
Keywords
Missing
Ordinance #
Ordinance Summary
Ordinance Title
Planning File #
Property Address
Property PIN
Publication Newspaper
Publication Title
Publication Type
Resolution #
Resolution Summary
Resolution Title
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 EXISTING CONDITIONS <br />3.1. Waternmin <br />The existing water distribution mains in the project area were installed in 1956 and <br />consist of 4 -inch cast iron pipe (CIP). This system has experienced breaks in the past and <br />is likely to experience future breaks as the pipes are exceeding 50 years of service. in <br />addition, the cast iron pipes are probably heavily corroded and possibly leaking. <br />3.2. Storm Sewer <br />Stormwater within the alley either drains overland toward Craft Drive or into the <br />backyards of the homes located on the east side of the alley which have experienced <br />minor flooding during heavy rain and snow melting events. The Arbors Townhome <br />Community currently has a storm sewer system to collect drainage within the <br />Association. <br />3.3. Streets <br />The proposed reconstruction area consists of a 12 -Foot wide bituminous alley without <br />curb and gutter. Soil borings have not been performed at this location; however, the <br />extensive rutting of the existing surface in the project area is indicative of the poor <br />subgrade soils found throughout the city. <br />Feasibility Report <br />Arbors Alley Roadway and Utility Improvement Project <br />City of St. Anthony <br />WS13 Project No. 1626-42 <br />Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.