Laserfiche WebLink
ORIGINAL 694 DESIGN <br />UNDERLYING ASSUMPTIONS <br />* Funding w W not be available to <br />construct enough capacity to meet <br />forecasted traffic Flows on I -35W. <br />Based on earlier studies by the Metro <br />Council, future transit use does not <br />warrant consideration of rail based <br />transit service options at this time. <br />NM P ,SAL. "UP NORTH" <br />,, l,i <br />