Laserfiche WebLink
NEXT MN/PASS STUDY <br />* Building On 1-394 & 1-35W South <br />Experience <br />Key Strategy For Balancing <br />Demand/Supply & Funding Availab <br />NM 1-35W Corridor Is Percolating U <br />"OPT IN TOLLING" <br />1-6941SNELLING PROJECT <br />Seeking active Traffic management and/or lower- <br />cost/high-benefit solutions to augment other proposed <br />corridor improvements. <br />Previous Planned Project: <br />• New general-purpose lanes eastheund and westtround. <br />• Replace or redesign interchanges at 1.35W and Rico St. <br />- Reassessment Considerations: <br />• • Interchange modifrcalipnxonaolidmion at I-691 and 1.35W <br />leas) to nanh ffyover ramp). <br />• New managed Ames between 1.35W and 135E contingent on <br />interchange n 1proven-1. <br />Wer-cosbhigh-benelil project Wing developed lot the I - <br />43.S. Highway 101SIale Highway $1 inlerchange project <br />which will provide for fulure east and westbound lanes <br />hefwee+,135W and Lezinuton Ave. <br />• Inlerct+antic <epl.,ceon-t al 1.694 and Rim Su (new managed <br />Lynes belween Le—glop Ave and 1-35E). <br />