<br />Project Material Status
<br />Nem Item DescApOonUnBs
<br />No.
<br />SCHEDULE A•SURFACE IMPROVEMENTS
<br />Unit
<br />Contrail
<br />Quantity
<br />QuanOly to
<br />Date
<br />Current
<br />QuanS
<br />Amount to
<br />Date
<br />1
<br />2027.501 MOBILIZATION
<br />LUMP SUM $25,000.00
<br />1
<br />1
<br />2
<br />2101.602 CLEARING
<br />TREE
<br />$200.00
<br />0
<br />$25,000.00
<br />3
<br />2101.507 GRUBBING
<br />TREE
<br />$100.00
<br />18
<br />43
<br />0
<br />$8,600.90
<br />4
<br />2104.501 REMOVE CURB AND GUTTER
<br />LIN FT
<br />$2.50
<br />18
<br />44
<br />0
<br />$4,400.00
<br />5
<br />2104.503 REMOVE BITUMINOUS WALK
<br />4880
<br />6277.76
<br />420
<br />$15,894.38
<br />6
<br />SQ FT
<br />$1.00
<br />125
<br />606
<br />0
<br />$606.00
<br />2104.503 REMOVE CONCRETE WALK
<br />SQ FT
<br />$0.80
<br />4670
<br />M 10060
<br />7
<br />2104.505 REMOVE CONCRETE PAVEMENT
<br />Sq YD
<br />$7.00
<br />0
<br />$8,048.00
<br />8
<br />2104.605 REMOVE BITUMINOUS PAVEMENT
<br />SQ YD
<br />530
<br />720
<br />0
<br />55,040.00
<br />9
<br />2104.509 REMOVE HANDHOLE
<br />$1.35
<br />11368
<br />9493.67
<br />0
<br />§12,816.45
<br />10
<br />2104.511 SAWING CONCRETE PAVEMENT (FULL DEPTH)
<br />EACH
<br />UN FT
<br />$360A0
<br />3
<br />3
<br />0
<br />$1,140.00
<br />11
<br />2104.513 SAWING BITUMINOUS PAVEMENT (FULL DEPTH)
<br />LIN FT
<br />25',00
<br />376
<br />333.4
<br />0
<br />$1,667.00
<br />12
<br />2104.523 SALVAGE SIGN
<br />$3.00
<br />340
<br />1373.6
<br />0
<br />$4,120.50
<br />13
<br />2104.523 SALVAGE MAIL BOXEACH
<br />EACH
<br />$25.00
<br />39
<br />4
<br />0
<br />$100.00
<br />14
<br />2104.801 SALVAGE AND REINSTALL LANDSCAPE STRUCTURES
<br />LUMP SUM
<br />$35.00
<br />$1,000.00
<br />10
<br />7
<br />0
<br />$245.00
<br />15
<br />2104.601 CLEANUP
<br />LUMPSUM
<br />$1,D00.00
<br />1
<br />1
<br />1
<br />0
<br />$1,000.00
<br />76
<br />2105.501 COMMON EXCAVATION (P)
<br />CU YD
<br />$8.75
<br />1
<br />0
<br />$1,000.00
<br />17
<br />2105.507 SUBGRADE EXCAVATION
<br />10863
<br />10765.43
<br />D
<br />§164,962.94
<br />18
<br />2705.622 SELECT GRANULAR BORROW
<br />CU YO
<br />$7,00
<br />500
<br />320.1
<br />0
<br />$2,240.70
<br />19
<br />2105.525 TOPSOIL BORROW (LV)
<br />CU YO
<br />$14.25
<br />3480
<br />3480
<br />0
<br />S4%590.00
<br />20
<br />2105.604 GE07EXT'ILE FABRIC TYPE V
<br />CU YD
<br />$6A0
<br />1865
<br />1361.94
<br />81.5
<br />28,171.84
<br />21
<br />2105.609 CRUSHED ROCK 3" MINUS (ROAD SUPPORT)
<br />SQ YD
<br />$7.35
<br />11490
<br />11490
<br />0
<br />215,511.50
<br />22
<br />2112.507 SUBGRADE PREPARATION
<br />TON
<br />$13.35
<br />600
<br />188.3
<br />0
<br />§2,513.01
<br />ROAD A
<br />§300.00
<br />23
<br />23
<br />0
<br />$61800.00
<br />23
<br />2211.501 AGGREGATE BASE CLASS 5
<br />TON
<br />$10.25
<br />24
<br />2232.501 MILL BITUMINOUS SURFACE(7.75')
<br />SQYO
<br />5176
<br />5027.86
<br />0
<br />$51,535.57
<br />25
<br />2350.503 TYPE LV WEARING COURSE MIXTURE FOR DRIVEWAYS SQ YD
<br />$0.95
<br />18370
<br />19033.6
<br />0
<br />$18,081.92
<br />26
<br />2357.502 BITUMINOUS MATERIAL FOR TACK COAT
<br />GALLON
<br />$25.00
<br />360
<br />395.44
<br />0
<br />$8,866.00
<br />27
<br />2360.501 TYPE SP 12.5 WEARING COURSE MIXTURE (2,C)
<br />TON
<br />$1.80
<br />2317
<br />1545
<br />400
<br />$2,781.00
<br />28
<br />2411.618 MODULAR BLOCK RETAINING WALL
<br />SO FT
<br />$59.00
<br />4290
<br />4551.85
<br />1014.91
<br />$268,559.15
<br />29
<br />2502.521 4"PVC PIPE DRAIN
<br />222,50
<br />270
<br />299.26
<br />0
<br />$6,733.35
<br />LIN FT
<br />$8.00
<br />60
<br />0
<br />0
<br />0.00
<br />$$0.00
<br />30
<br />2602.541 6" PERF PE PIPE DRAIN
<br />LIN FT
<br />$6.25
<br />4500
<br />4fi80
<br />31
<br />2502.602 6" PVC PIPE DRAIN CLEANOUT
<br />EACH
<br />0
<br />$29,2
<br />32
<br />2505.601 UTILITY COORDINATION
<br />LUMP SUM
<br />$250.00
<br />$1.00
<br />12
<br />0
<br />0
<br />$0,00
<br />33
<br />2521.501 4" CONCRETE WALK
<br />SQ FT
<br />$2.68
<br />1
<br />32560
<br />1
<br />31837.77
<br />0
<br />$100
<br />34
<br />2531.501 CONCRETE CURB & GUTTER DESIGN 8618
<br />LIN FT
<br />28.55
<br />140
<br />$85,325.22
<br />35
<br />25$1.507 6" CONCRETE DRIVEWAY PAVEMENT
<br />SQ YD
<br />4665
<br />5990
<br />0
<br />$51,214.50
<br />36
<br />2531.507 8" CONCRETE DRIVEWAY PAVEMENT
<br />SQ YD
<br />§08.00
<br />390
<br />358.68
<br />0
<br />$17,216.64
<br />37
<br />2531.602 PEDESTRIAN CURB RAMP
<br />$57.25
<br />774
<br />427.63
<br />0
<br />$24,481.82
<br />38
<br />2531.618 TRUNCATED DOMES
<br />EACH
<br />$300.00
<br />30
<br />32
<br />1
<br />$9,600.00
<br />SQ FT
<br />$26.00
<br />248
<br />256
<br />8
<br />$6,656.00
<br />39
<br />2540.602 BOLLARD
<br />EACH
<br />$350.00
<br />2
<br />2
<br />40
<br />2540.6021NSTALL SALVAGED MAIL BOX
<br />EACH
<br />$40.00
<br />0
<br />$700.00
<br />41
<br />2563.601 TRAFFIC CONTROL
<br />LUMP SUM
<br />$3,500.00
<br />10
<br />1
<br />7
<br />0
<br />$280.00
<br />42
<br />2564.533 FURNISH SIGN PANELS TYPE C
<br />SO FT
<br />$15.00
<br />1
<br />0
<br />$3,500.00
<br />43
<br />2564.533 FURNISH SIGN PANELS TYPED
<br />SQ FT
<br />170.25
<br />188.76
<br />18.5
<br />$2,831.40
<br />44
<br />2564.602 FURNISH SIGN POSTS
<br />$15.00
<br />53.25
<br />38.25
<br />0
<br />$573.75
<br />45
<br />2565.602 HANDHOLE
<br />EACH
<br />$85.00
<br />28
<br />30
<br />2
<br />S2,550.00
<br />EACH
<br />$925.00
<br />3
<br />2
<br />1
<br />$7,850.00
<br />46
<br />2565.602 NMC LOOP DETECTOR 6'X6'
<br />EACH
<br />$1,025.00
<br />8
<br />47
<br />2565.602 NMC LOOP DETECTOR 6'X15'
<br />EACH
<br />$1,450.00
<br />6 6
<br />0
<br />$8,150.00
<br />48
<br />2571.541 TRANSPLANT TREE (SPADE SIZE 42"1
<br />TREE
<br />$150.00
<br />3
<br />D
<br />$0.00
<br />49
<br />2573.502 SILT FENCE, TYPE HEAVY DUTY
<br />LIN FT
<br />$2.00
<br />1414
<br />0
<br />$2,100.00
<br />60 12573.530
<br />STORM DRAIN INLET PROTECTION
<br />EACH
<br />358
<br />186
<br />0
<br />$372.00
<br />$1.00
<br />26
<br />16
<br />0
<br />$16.00