Laserfiche WebLink
24 <br />Item <br />No. <br />Item Description <br />Units <br />Unit Price Contract <br />Quantity <br />Quantity to Current <br />Date Quantity <br />Amountto <br />Date <br />51 <br />2573.802 TEMPORARY ROCK CONSTRUCTION ENTRANCE <br />EACH <br />$1,250.00 <br />2 <br />6 <br />0 <br />$10,000.00 <br />52 <br />2575.605 HYDROSEEDING <br />ACRE <br />$1,750,00 <br />1.76 <br />2.336 <br />0.3 <br />$4,066.00 <br />53 <br />2582.502 4" SOLID LINE WHHE-PAINT <br />UN FT <br />$0.11 <br />4210 <br />4091 <br />D <br />$450.01 <br />54 <br />2582.502 24" STOP LINE MITE -PAINT <br />LIN FT <br />$2.17 <br />78 <br />83 <br />0 <br />$138.71 <br />55 <br />2582.5024"DOUBLE SOLID LINE YELLOW -PAINT <br />LIN FT <br />$0.22 <br />1930 <br />1938 <br />0 <br />$426.36 <br />56 <br />2582.502 4" SOLID LINE WHITE-EPDXY <br />LIN FT <br />$0.23 <br />9410 <br />9204 <br />4204 <br />$2,116.92 <br />57 <br />2582.502 24" STOP LINE WHITE-EPDXY <br />LIN FT <br />$5.00 <br />20BI <br />216 <br />62.5 <br />$1,080.00 <br />58 <br />2582.60214- DOUBLE SOLID LINEYELLOALEPDXY <br />LIN FT <br />$0.46 <br />6280 <br />8127 <br />1924 <br />$2,818.42 <br />59 <br />2582.503 CROSSWALK MARKING -PAINT <br />SQ FT <br />$1.69 <br />318 <br />198 <br />0 <br />$314.82 <br />60 <br />2582.603 CROSSWALK MARKING•EPDXY <br />SQ FT <br />$269 <br />838 <br />1140 <br />330 <br />$3,066.60 <br />Totals For Seclion SCHEDULE A -SURFACE IMPROVEMENTS: <br />$906,111.08 <br />SCHEDULE B -SANITARY SEWER IMPROVEMNITS <br />61 <br />2104.501 REMOVE SEWER PIPE (SANITARY) <br />LIN FT <br />$3.00 <br />0 <br />$2,331Ao <br />62 <br />2104.509 REMOVE SANITARY SEWER SERVICE <br />EACH <br />$250.00 <br />0 <br />$1,000.00 <br />63 <br />2104.509 REMOVE MANHOLE (SANITARY) <br />EACH <br />$350.00 <br />0 <br />$1,400.00 <br />64 <br />2104.603 ABANDON PIPE SEWER <br />UN FT <br />$5.00 <br />0 <br />$0.00 <br />85 <br />2461.609 AGGREGATE BEDDING (LV) <br />CU YD <br />$0.01 <br />0 <br />$0.53 <br />66 <br />2503.601 SANITARY SEWER BYPASS PUMPING <br />LUMP SUM $2,500.00 <br />F4-3 <br />0 <br />$2,500.00 <br />67 <br />2503.602 CONNECT TO EXISTING MANHOLES (SAN) <br />EACH <br />$500.00 <br />0 <br />$2,500.00 <br />68 <br />2503.602 CONNECT TO EXISTING SANITARY SEWER <br />EACH <br />$500.00 <br />0 <br />$4,500.00 <br />69 <br />2503.602 CONNECT TO EXISTING SANITARY SEWER SERVICE EACH <br />$500.00 <br />0 <br />$15000070 <br />2503.602 CHIMNEYSEALS <br />EACH <br />$175.00 <br />0 <br />$1,400.00 <br />71 <br />2503.602 8"Xe" PVC WYE <br />EACH <br />$250.511 <br />0 <br />$600.00 <br />72 <br />2503.603 16" DUCTILE IRON PIPE SEWER CL 52 <br />LIN FT <br />$65.00 <br />20 <br />0 <br />0 <br />$0.00 <br />73 <br />2503,603 6" PVC PIPE SEWER- SDR 20 <br />LIN FT <br />$35.00 <br />65 <br />93 <br />0 <br />$3,255.00 <br />74 <br />2503.603 8" PVC PIPE SEWER- SDR 26 <br />LIN FT <br />$29.00 <br />359 <br />318 <br />0 <br />$9,222.00 <br />75 <br />2503.603 15" PVC PIPE SEWER -SDR 26 <br />LIN FT <br />$45.00 <br />239 <br />0 <br />0 <br />$0.00 <br />76 <br />12603.6031TELEVISE SANITARY SEWER <br />LIN FT <br />$0,65 <br />33351 <br />562 <br />0 <br />$365.30 <br />77 <br />2503.603 8" PVC PIPE SEWER -SDR 35 <br />LINFT <br />$28.00 <br />753 <br />525 <br />0 <br />$14,700.00 <br />78 <br />2503.603 12" CURED -IN-PLACE PIPE SYSTEM <br />LIN FT <br />533.50 <br />1520 <br />1475 <br />0 <br />$49,412.50 <br />79 <br />2506.516 CASTING ASSEMBLY(SANITARY) <br />EACH <br />$400.00 <br />17 <br />17 <br />0 <br />$6,600.00 <br />80 <br />2606.522 ADJUST FRAME & RING CASTING <br />EACH <br />$350.00 <br />0 <br />0 <br />p <br />$0.00 <br />81 <br />2506.602 RECONSTRUCT SANITARY MANHOLES <br />EACH <br />$1,000.00 <br />4 <br />4 <br />0 <br />$4,000.00 <br />62 <br />2506.603 CONSTRUCT 16" OUTSIDE DROP <br />LIN FT <br />$650.005.8 <br />0 <br />0 <br />$0.00 <br />83 <br />2506.603 CONST 48" DIA SAN SEWER MANHOLE <br />LIN FT <br />$110.00 <br />72.7 <br />118.27 <br />0 <br />$13,009.70 <br />Totals For Section SCHEDULE B -SANITARY SEWER IMPROVEMENTS: <br />$118,396.03 <br />SCHEDULE C - WATER SYSTEM IMPROVEMENTS <br />84 <br />2104.501 REMOVE WATER MAIN <br />LIN FT <br />$3.00 <br />1930 <br />2815 <br />0 <br />$8,445.00 <br />85 <br />2104.509 REMOVE WATER SERVICE AND CURB BOX <br />EACH <br />$250.00 <br />6 <br />6 <br />0 <br />$1,500.00 <br />86 <br />2104.509 REMOVE HYDRANTAND VALVE <br />FACH <br />$350.00 <br />3 <br />10 <br />0 <br />$3,500.00 <br />87 <br />2104.509 REMOVE GATE VALVE & BOX <br />EACH <br />$350.00 <br />5 <br />14 <br />0 <br />$4,900.00 <br />88 <br />2104.523 SALVAGE AND REINSTALL HYDRANT ASSEMBLY <br />EACH <br />$1,250.00 <br />t <br />1 <br />0 <br />$1,250.00 <br />89 <br />2104.603 ABANDON WATER MAIN <br />LIN FT <br />$3.00 <br />2652 <br />1910 <br />0 <br />$5,730.00 <br />90 <br />2451.509 AGGREGATE BEDDING (LV) <br />CU YD <br />$0.01 <br />200 <br />143 <br />0 <br />$1.43 <br />91 <br />2504.601 TEMPORARY WATER SERVICE <br />LUMP SUM $2,500,00 <br />1 <br />1.996 <br />0 <br />$4,990.00 <br />92 <br />2504.602 CONNECTTO EXISTING WATER MAIN <br />EACH <br />$500.00 <br />14 <br />15 <br />0 <br />$7,500.00 <br />93 <br />2504.602 CONNECT TO FISTING WATER SERVICE <br />EACH <br />$500.00 <br />6 <br />7 <br />0 <br />$3,500.00 <br />94 <br />2504.602 1" CORPORATION STOP <br />EACH <br />5175.00 <br />4 <br />6 <br />0 <br />$1,050.00 <br />95 <br />2504.802 1.5"CORPORATION STOP <br />EACH <br />$300.00 <br />21 <br />1 <br />0 <br />$300.00 <br />96 <br />2504.602 6" GATE VALVE AND BOX <br />EACH <br />$1,050.00 <br />51 <br />4 <br />0 <br />$4,200.00 <br />