Laserfiche WebLink
25 <br />Item <br />No. <br />Item Description <br />UnIts <br />Unit Price Contact <br />Quanttty <br />Quantity to Current <br />Date Quantity <br />Amountto <br />Date <br />97 <br />2504.602 8" GATE VALVE AND BOX <br />EACH <br />$1,450.00 <br />20 <br />22 0 <br />$31,900.00 <br />98 <br />2504.802 1" CURB STOP & BOX <br />EACH <br />$260.00 <br />4 <br />6 0 <br />57,60000 <br />99 <br />2504.602 15" CURB STOP & BOX <br />EACH <br />5450.00 <br />2 <br />2 0 <br />$900.00 <br />100 <br />2504.602 HYDRANTASSEMBLY - <br />EACH <br />$3,250.00 <br />8 <br />9 0 <br />$29,250.00 <br />101 <br />2504.603 1"TYPE K COPPER PIPE <br />LIN FT <br />$25.00 <br />Be <br />135 0 <br />$3,375.00 <br />102 <br />2504.603 1.5" TYPE K COPPER PIPE <br />LIN FT <br />$35.00 <br />30 <br />21 0 <br />$735.00 <br />103 <br />2504.603 8" WATER MAIN -DUCT IRON CL 52 <br />LIN FT <br />$28.00 <br />764 <br />162 0 <br />$4,536.00 <br />104 <br />2504.603 6" PVC WATER MAIN <br />UN FT <br />523.00 <br />4418 <br />4588 0 <br />$105,0117.00 <br />105 <br />2504.604 4" POLYSTYRENE INSULATION <br />SQ YD <br />515.00 <br />50 <br />141 0 <br />$210.00 <br />106 <br />2504.608 DUCTILE IRON FITTINGS <br />POUND <br />$1.80 <br />6215 <br />6015 0 <br />$9,624.00 <br />Totals For Section SCHEDULE C- WATER SYSTEM IMPROVEMENTS: <br />$233,983.43 <br />SCHEDULED- DRAINAGE IMPROVEMENTS <br />107 <br />2104.501 REMOVE SEWER PIPE (STORM) <br />LIN FT <br />$5.00 <br />1226 <br />1288 0 <br />$6,440.00 <br />108 <br />2104.509 REMOVE DRAINAGE STRUCTURE <br />EACH <br />$350.(10 <br />15 <br />18 0 <br />58,300.00 <br />109 <br />2451.509 AGGREGATE BEDDING (LV) <br />CU YD <br />$0.01 <br />150 <br />0 p <br />$D.DO <br />110 <br />2603,641 15" RC PIPE SEWER DESIGN $006 CLASS V <br />LIN FT <br />$23.00 <br />409 <br />468 0 <br />$10,718.00 <br />711 <br />2603.541 18" RC PIPE SEWER DESIGN 3006 CLASS V <br />LIN FT <br />$26.00 <br />212 <br />154 0 <br />$4,004.00 <br />112 <br />2503.541 21" RC PIPE SEWER DESIGN 3006 CLASS Ill <br />LIN FT <br />$29.00 <br />408 <br />408 0 <br />$11,832.00 <br />113 <br />2503.541 24" RC PIPE SEWER DESIGN 3006 CLASS Ill <br />LIN FT <br />$32.00 <br />254 <br />264 0 <br />$8,128.00 <br />114 <br />12503.541.30" RC PIPE SEWER DESIGN 30DO CLASS III <br />LIN FT <br />$45.00 <br />174 <br />165 0 <br />$7,425.00 <br />115 <br />12503,541 42" RC PIPE SEWER DESIGN 3006 CLASS Ill <br />UN FT <br />$73.00 <br />81 <br />61 0 <br />$5,913.00 <br />116 <br />2503.641 30" RC PIPE SEWER DESIGN 3008 CLASS 11 <br />LIN FT <br />$45,DO <br />75 <br />0 0 <br />$0.00 <br />117 <br />2503.602 CONNECT TO EXISTING STORM SEWER <br />EACH <br />$500.00 <br />121 <br />9 0 <br />$4,500.00 <br />118 <br />2503.002 CONNECT INTO EXISTING DRAINAGE STRUCTURE <br />EACH <br />$1,000.00 <br />1 <br />4 0 <br />$4,000.00 <br />119 <br />2508.501 CONSTRUCT DRAINAGE STRUCTURE DESIGN 46-4020 <br />LIN FT <br />$200.00 <br />53.6 <br />66.6 0 <br />5131320,00 <br />120 <br />2506.501 CONSTRUCT DRAINAGE STRUCTURE DESIGN 60-4020 <br />LIN FT <br />$300.00 <br />31,5 <br />31.5 0 <br />$9,450,00 <br />121 <br />2506,501 CONSTRUCT DRAINAGE STRUCTURE DESIGN 72-402D <br />LIN FT <br />$375.OD <br />17 <br />17 0 <br />$6,375.00 <br />122 <br />2506.601 CONSTRUCT DRAINAGE STRUCTURE DESIGN 844020 <br />LIN FT <br />$500.D0 <br />25.8 <br />25.8 0 <br />$12,900.00 <br />123 <br />2506.502 CONSTRUCT DRAINAGE STRUCTURE DES SPECIAL (2'X3' CB) EACH <br />$1,100.00 <br />16 <br />18 0 <br />519,800.00 <br />124 <br />12506.516 CASTING ASSEMBLY (MANHOLE) <br />EACH <br />$400.00 <br />14 <br />14 0 <br />$5,600.00 <br />125 <br />2506.516 CASTING ASSEMBLY (CATCH BASIN) <br />EACH <br />$875.00 <br />81 <br />17 0 <br />$14,875.00 <br />126 <br />2506.522 ADJUST FRAME & RING CASTING <br />EACH <br />$350.00 <br />3 <br />0 0 <br />$0.00 <br />127 <br />2506.602 RECONSTRUCT DRAINAGE STRUCTURE <br />EACH <br />$1,000.00 <br />3 <br />7 0 <br />$7,000.00 <br />Totals For Section SCHEDULE D- DRAINAGE IMPROVEMENTS: <br />$758,560.00 <br />Charge Order 1 <br />143 <br />2104.505 REMOVE BITUMINOUS PAVEMENT <br />ISO YD <br />1 $5.451 <br />413 <br />413 0 <br />$2,250.85 <br />144 <br />12232.5011 MILL BITUMINOUS SURFACE (2.0') <br />SQ YD <br />1 $2.95 <br />1346 <br />7346 0 <br />$3,970.70 <br />145 <br />2360.501 TYPESP 12.5 WEARING COURSE MIXTURE (2,G) <br />TON <br />$61,001 <br />0 <br />$12,126.80 <br />146 <br />2357,502 BLTUMINOUS MATERIAL FOR TACK COAT <br />GALLON <br />$1.90 <br />1151 <br />115 0 <br />$218.50 <br />Totals For Change Order 1: <br />$18,566.85 <br />Work Order 7 <br />128 <br />12573.5401 FIBER LOG TYPE STRAW BIOROLL <br />LIN FT <br />1 $3.001 <br />23261 <br />23251 <br />$6,975.00 <br />Totals For Work Order 1; <br />1 $6,975.00 <br />Work Order 2 <br />129 <br />12505.6011 STORM SEWER REALIGNMENT <br />LUMP SUM <br />1 $3,688.501 <br />11 <br />50 <br />Totals For Work Order 2; <br />1 $3,688.50 <br />Work Order 3 <br />130 <br />2104.507 <br />1 REMOVE GUARDRAIL <br />LIN FT <br />1 $10.001 <br />651 <br />60.247 <br />0 <br />$602,47 <br />137 <br />2104.509 <br />REMOVE GUARD POST <br />EACH <br />$75.00 <br />6 <br />61 <br />0 <br />$450.00 <br />Totals For Work Order 3: <br />$1,052.47 <br />