Laserfiche WebLink
38 <br />Commun ity Outreach -We found that commun ity outreach wa s very imp ortant and that <br />without it, th e system wasn't utilize d as expected. <br />LED Viewing -LED 's have a viewing angle and an optim al a imin g for maximum <br />brightness. This ha s to be considered during de sign as we ll and in stallation. <br />Status : In sta ll ed and Operationa l <br />Total Duration of Project: 1 year from baseline counts to final counts. <br />Project End Date: Installation comp leted in September of 2012, Pedestrian counts <br />completed in May of 2013. <br />Approximate Cost of Entire Project Materials -$27,500, Installation -27,000, <br />eng in eering (including concept development, UMN Capstone mentoring , preliminary <br />design, PS&E , construction oversight & evaluation) -$25,000. TOTAL : $79,500. <br />Total OPERA Funds used for project: $10,000 <br />Send and Email a completed report with pictures to: Mindy Carlson, CTS -200 <br />TSB, 511 Washington Ave. SE, Mp ls. MN 55455, email carlson@umn.edu . For <br />questions about this report please contact Mindy Ca rl so n at 612-625-181 3.