Laserfiche WebLink
1. EXECUTIVE SUMMARY <br />The 2014 Street and Utility Improvement Project consists of reconstructing the following <br />30 -foot -wide urban roadways totaling approximately 3,350 feet (0.64 miles): <br />Edgemere Avenue from Penrod Lane to Chelmsford Lane <br />Wendhurst Avenue from Penrod Lane to Chelmsford Lane <br />Penrod Lane from 36°i Avenue NE to 37°' Avenue NE (Co. Rd. D) <br />'The improvements include removing the existing pavement, correcting the subgrade, <br />installing concrete curb and gutter, and installing new pavement. <br />Proposed utility improvements include the removal and replacement of approximately <br />3,400 feet of sanitary sewer including manholes and services; removal and replacement <br />of approximately 3,600 feet of water main including hydrants, valves and services; and <br />installation of new storm sewer facilities. <br />A map illustrating the project location can be found on Figure I in AppendixA. <br />A total estimated project cost for the proposed street and utility reconstruction is <br />approximately $2.2 million. Funding for the project will come from the City's Street and <br />Utility Reconstruction Funds (Public Improvement Bonds), Water Utility Fund, <br />Stormwater Utility Pond, Sanitary Sewer Utility Fund, and Special Assessments to the <br />benefiting properties. <br />The project reconstruction can be completed in 2014, including the fust lift of bituminous <br />and all restoration items. The final lift of bituminous is proposed to be installed in June <br />of 2015. <br />This project is feasible, necessary, and cost effective from an engineering standpoint and <br />should be constructed as proposed herein. The economic feasibility of this project will <br />need to be determined by the City Council. <br />2014 s"rREE'r AND UTILITY IMPROVEMENTPROJECT <br />FEASIBILITY REPORT <br />CITY OF ST. ANTHONY VILLAGE <br />NSB PROJECT' NO. 1626-82 <br />TABLE OF CON'1'EN'rS <br />PAGE I <br />23 <br />