Laserfiche WebLink
mire <br />OPINION OF PROBABLE COST'S <br />2014 SFRIT T AND U I'll,ITY RVCONSTRIICITON <br />PROJECT NO. 1626-820 <br />SI, AN'I'MONY. MN <br />SIT I MBER 10, 2013 <br />No. <br />Mat. No. <br />Item <br />Units <br />Estimated <br />Estimated <br />Lstimated <br />Unit Price <br />Quantity <br />Cost <br />SCREDULE 1) - DRAINAGE, IMPROVEMENTS <br />87 <br />2104501 <br />RI:MOVP 51 WD12 PIPESSTORM_) <br />LIN FL <br />100 <br />$600 <br />$600,00 <br />88 <br />__ <br />IAINAGES <br />I(1,V) 21, <br />EACH_ <br />__ <br />89 <br />2491,602 <br />AUGREGA IOE _ - _- <br />I BEDDING <br />CU YD <br />- 150 <br />52000 <br />$3,000,00 <br />,00 <br />90 <br />2503541 <br />IS RC IIIIIE SEWER DESIGN i00G CLASS V <br />LIN RI <br />2400 <br />$32,00 <br />$76,800.00 <br />91 <br />2503.602 <br />,. <br />CONNh.CI IO LXISIING STORM SI WIR _ <br />EACH <br />_ <br />_1 <br />_$1,00000 <br />- _ <br />$1,000.00 <br />92 <br />2S06501 <br />CONSI RUCl DRAINAGE SPRI7CIUI2G DESIGN 484020_ <br />LIN tI <br />_60 <br />S30000 <br />SI8,000.00 <br />9i <br />2506102 <br />CONSI'RUCI DRAINAGE STRUCfURF DFSIGN SPLCIAL 1 <br />EACH <br />11 <br />_ S1,30000 <br />514,300.0_0 <br />94 <br />2506.602 <br />CASTING ASSEMBLY STORM <br />LACK <br />II <br />$600.00 <br />$6600,00 <br />SUBTOTAL SCHEDULE 1) DRAINAGE IMPROVEMENTS_ <br />_ S121,300.00_ <br />+10% CON'TINGENCTES <br />S12,66.00 <br />SUBTOTAL SCHEDULE D- DRAINAGE IMPROV I-sMF.N'1'S <br />5133,430.00 <br />ADMINISTRATIVE,+20%LEGAL, I:TC. <br />$26686.00 <br />TOTAL SCIIL.DULE D - DRAINAGE, IMPROVEMTNTS <br />5160,116.00 <br />