Laserfiche WebLink
m <br />OPINION OF PROBABLE COSTS <br />2014 S'IRI TI' AND UTILITY RPCONSTRUCTION <br />PROJRC'P NO. 1626-820 <br />STAN TONY, MN <br />SPI: i13MBER 10, 2013 <br />No. <br />Mat. No. <br />Item <br />Units <br />1?stimatcd <br />EStimatcd <br />Estimated <br />Unit 1llicc <br />Qnantily <br />Cost <br />SCHEDULE E - RAIN GARDEN IMPROVEMENTS <br />95 201,501 <br />MOBILIZATION <br />LUMP Sl1M <br />57,50000 <br />57,50000 <br />96 2104,501 <br />( <br />;WF_ _ <br />RFMVIZ97 ISI <br />AN I_I <br />2104509 <br />RI?MOVC DRAINACI RUCII URI: - <br />IACII <br />30 <br />$35000-- <br />51,05000 <br />981 2104.602 <br />SALVAGE AND RHINS'IAIL SEWER PIPES FORM)_ <br />LIN PI <br />50 <br />S1500_ <br />$750,00- <br />'29 1 2104.603 <br />ABANDON SKWI:R PIPL(S I ORM) _ _ <br />LIN PI <br />350 <br />_. <br />$1500_ <br />55,250,00_ <br />100 1 2105.501 <br />_ <br />COMMON I XCAVAI ION <br />Cu YD <br />_ <br />SI000 <br />S35,000.00 <br />IOL j 2104.501 <br />_ <br />8 PURFDRAIN FILE PH SOLID ALL FUSED <br />LIN <br />0 <br />_ <br />102 2104.603 <br />ROCK T'RENCI i(2'X G W <br />TON <br />_3500_ <br />950 <br />, <br />$S24,005500 <br />SI9,250.00 <br />103 2105.604 <br />CIOIbXIl1F FABRIC FYPI IV _ _ <br />SO YD <br />_600 <br />--, <br />$400 <br />_ <br />$240000_ <br />104 2501 511 <br />IS RC POI SF WI R DESIGN 3006 CL V _ <br />LIN V]_100 <br />S32.00 <br />200 <br />S300 <br />105 2501.515 <br />_ <br />IS RC-PIIL APRON W/1245111, DARD _ <br />LACK <br />$60000_ <br />_ <br />$1800.00 <br />106 2504602 <br /><ONN6'CI FO EXISTING DRAENAGE S I RUC IUSE <br />LACII <br />_3 <br />1 <br />$30000 <br />S300.00_ <br />1071 2506.507 <br />ICONS PRUCFURAINAGL S112UCFUR_L DESIGN SPECIAL _ <br />I-ACII <br />_ <br />1 <br />_ $1,60000_ <br />_ <br />$1,60000_ <br />108 2579.502 <br />SIW FHNCE, I YI L III:AVY DU I Y <br />I <br />I IN PI <br />600 <br />( $2,50 <br />S1,500.00 <br />109 2575505 <br />SODDING IYPF, LAWN (INCL I OPSOIL& FFRT) <br />SOYU <br />500 <br />$600 <br />53,00000_ <br />110 2575.513 <br />_ <br />MIREDDID HARDWOOD MUICII <br />cu YD <br />200 <br />5900 <br />$1,80000 <br />111 2575.523 <br />GI20SION CON 1110L BLANKET (CAI RGORY 3) _ <br />SO YO <br />1000 <br />S4 00 <br />S4,000.00 <br />112 2575.550iPLANI'13pDDING <br />MA'17;RIAE- <br />Cu YD <br />1 1500 <br />575.00_ <br />522500.00 <br />113 2575,604 <br />SLI4DING w/SI:BU MIXT URE33-261 <br />ACRD <br />i I <br />_ <br />5130000 <br />51300,00 <br />SUBTOTAL SCHEDULE D- DRAINAGE IMPROVEMENTS <br />5134,280.00 <br />+10% CONTINGENCIES <br />$13428.00 <br />SUBTOTAL SCHEDULE _1)- DRAINAGE IMPROVEMENTS <br />-- - <br />5147,708.00 <br />__ <br />+20% ADMINISTRATIVE, LE 'AL, LTC <br />529542.00 <br />-- 'TOTAL SCHEDIII,Ll)- DRAINAGE, IMPROVEMI?N'CS <br />5177,2.50.00 <br />