My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCMin_87Mar11
FalconHeights
>
City Council
>
City Council Meeting Minutes
>
198x
>
1987
>
CCMin_87Mar11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2009 8:44:57 AM
Creation date
6/23/2009 1:08:09 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES <br />REGULAR CITY COUNCIL MEETING <br />MARCH 11, 1987 <br />Baldwin opened the meeting at 7:OOP.M. <br />ALL MEMBERS PRESENT <br />Baldwin, Chenoweth, Wallin, Hard, and Ciernia. Also present were Barnes <br />and Maurer. <br />ADDENDUM TO AGENDA <br />Ciernia moved, seconded by Wallin, addition of Item 5.(j) (Northome <br />Shopping Center Fire Code Violations) to the agenda. Motion carried <br />unanimously. <br />CONSENT AGENDA <br />Hard moved, seconded by Wallin, approval of the Consent Agenda. Motion <br />carried unanimously. <br />MINUTES OF FEBRUARY 25, 1987 APPROVED <br />Wallin moved, seconded by Hard, approval of the Minutes of February 25, <br />1987. Motion carried unanimously. <br />APPROVAL OF REQUEST FROM RICHARD WENKEL, 1825 FAIRVIEW, TO CONSTRUCT A <br />UTILITY SHED ON HIS PROPERTY <br />Wallin explained the Planning Commission had approved the shed with the <br />stipulation it be Buff iciently anchored to prevent it from blowing away. <br />Wallin inquired about the depth of the poles for the pole building and Mr. <br />Wenkel indicated the poles would be 4 to 6 feet into the ground. Hard <br />moved, seconded by Wallin, approval of Mr. Winkel's request based on the <br />site plan provided. Motion carried unanimously. <br />ENGINEER TO PREPARE FEASIBILITY STUDY ON SNELLING AVENUE WATERMAIN <br />Maurer reviewed his letter dated March 5, 1987 relating to the proposed <br />Snelling Avenue Watermain (a copy of which is on file in the clerk's <br />office), explained a letter detailing all costs will be submitted to the <br />City by MN/DOT. He felt it would be appropriate for Council to order the <br />feasibility study and schedule the necessary public hearings at this <br />time. Hard moved, seconded by Wallin, authorizing Maurer to prepare a <br />feasibility study on the Snelling Avenue Watermain Project. Motion <br />carried unanimously. <br />HEARING ON SNELLING AVENUE WATERMAIN IMPROVEMENT AND ASSESSMENTS SCHEDULED <br />FOR 4/22/87, 7:15 P.M. <br />Chenoweth moved, seconded by Wallin, that a public hearing on the Snelling <br />Avenue watermain and assessments be scheduled for April 22, 1987 at 7:15 <br />P.M. Motion carried unanimously. <br />ENGINEER TO PREPARE PLANS AND SPECIFICATIONS TO 1987 SEALCOATING (ALL <br />NORTHOME STREETS AND ARONA STREET, LARPENTEUR TO CRAWFORD) <br />Hard moved, seconded by Ciernia, authorizing the engineer to prepare the <br />plans and specifications for the 1987 sealcoating for all streets in <br />Northome and Arona St., Larpenteur to Crawford. Motion carried <br />unanimously. <br />,. <br />
The URL can be used to link to this page
Your browser does not support the video tag.