Laserfiche WebLink
Table B70 -Option 1 Joint Utility Annual Costs <br />Payment <br />Joint Utility Option 1, Year 2030 <br />1 1 % Annual Repair & Replacement <br />2 2% Annual Repair & Replacement <br />3 1 % Annual Repair & Replacement <br />4 2% Annual Repair & Replacement <br />5 3.3% Annual Repair & Replacemei <br />6 Contingency (30%) <br />7 Legal and Engineering (20 % of all <br />Subtotal <br />Table B11- Option 1 Centerville Annual Costs <br />Unit Unit Cost <br />Annual Costs <br />of NEW watermain 1 EA <br />of NEW storage and wells 1 EA <br />of EXISTING watermain <br />of EXISTING storage and wells 1 EA <br />it of SCADA system 1 EA <br />LS <br />$1 <br />Total Cost <br />$1 <br />Payment <br />Estimated <br />Item <br />Description <br />Quanti Unit Unit Cost <br />Total Cost <br />Centerville Option 1, Year 2030 <br />Annual Costs <br />1 <br />1 % Annual Repair & Replacement of NEW watermain <br />1 EA <br />$1,000.00 <br />2 <br />1 % Annual Repair & Replacement of EXISTING watermain <br />1 EA $220,000 <br />$220,000 <br />3 <br />Contingency (30%) <br />LS <br />$66,000 <br />4 <br />Legal and Engineering (20 % of all costs) <br />LS <br />$57,000 <br />Subtotal <br />Legal and Engineering (20 % of all costs) <br />LS <br />..-- „-w, <br />Table B12- Option 1 Circle Pines Annual Costs <br />Payment <br />Table <br />Estimated <br />Item <br />Description <br />Quantitv Unit Unit Cost <br />Total Cost <br />Circle Pines Option 1, Year 2030 <br />Annual Costs <br />1 <br />1%Annual Repair& Replacement of NEW watermain <br />1 EA $1,000 <br />$1,000.00 <br />2 <br />1 % Annual Repair & Replacement of EXISTING watermain <br />1 EA $200,000 <br />$200,000 <br />3 <br />Contingency (30%) <br />LS <br />$60,000 <br />4 <br />Legal and Engineering (20 % of all costs) <br />LS <br />$52,000 <br />Subtotal <br />Legal and Engineering (20 % of all costs) <br />LS <br />--_-__ <br />------- <br />Table B13 - Option 1 Columbus Annual Costs <br />Payment <br />Estimated <br />Item <br />Description <br />Quantity Unit Unit Cost <br />Total Cost <br />Columbus Option 1, Year 2030 <br />Annual Costs <br />1 <br />10 Annual Repair & Replacement of NEW watermain <br />1 EA 1 $23,0001 <br />$23,000.00 <br />2 <br />1 % Annual Repair & Replacement of EXISTING watermain <br />1 EA 1 $90.0001 <br />$90,000 <br />3 <br />Contingency (30%) <br />LS <br />$34,000, <br />4 <br />Legal and Engineering (20 % of all costs) <br />LS <br />$29,000 <br />Subtotal <br />.-_- ___ <br />