Laserfiche WebLink
Resolution 2014-13 <br />Page 2 <br />9. Prior to the installation of any signs, the applicant shall obtain a sign permit. <br />10. The portion of the trail used for the fire lane shall be plowed during the winter to <br />allow access. <br />11. Any areas of the trail along CSAH 8 that are disturbed from the construction access <br />into the site shall be restored to the City's satisfaction. <br />Prior to the issuance of a building permit: <br />12. The Final Plat and Development Agreement for Lavalle Fields shall be recorded. <br />13. The landscape plan shall be revised based on staffs comments. The landscape plan <br />shall be reviewed and approved by staff. <br />14. The applicant shall submit final design cut sheets for the pole and wall mounted light <br />fixtures to be reviewed and approved by staff. <br />15. The final design of the canopy shall be reviewed and approved by staff. <br />16. The applicant shall revise the architecture on the west elevation above the <br />underground parking area to include elements, such as larger windows, overhang <br />details, and revise the placement of the stone, to match the other elevations of the <br />building. <br />17. The gutter and downspout system shall be integrated into the building design and <br />shall be reviewed and approved by staff. <br />18. Construction details of the fire lane for the senior housing facility shall be reviewed <br />and approved by staff. <br />19. The location of the roof top and ground mechanical equipment shall be reviewed and <br />approved by staff. <br />Prior to issuance of a Certificate of Occupancy: <br />20. All roof top and ground mechanical equipment must be screened from view of <br />adjacent properties. Staff shall review and approve the locations. All ground -level <br />mechanical units shall be low profile and located to the side or rear of the building <br />and shall be screened from view of adjacent properties. Staff shall perform an <br />inspection when equipment is installed to ensure compliance with City code. <br />21. Finale Avenue between 145th Street and 146th Street shall be reconstructed as an <br />urban section roadway to a width of 26 feet to provide adequate street conditions for <br />the access into the senior housing facility. The construction plans will be reviewed <br />and approved by staff. <br />