My WebLink
|
Help
|
About
|
Sign Out
Home
2012.06.04 RESO 2012-11
Hugo
>
City Council
>
City Council Resolutions
>
2012 CC Resolutions
>
2012.06.04 RESO 2012-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2017 2:04:46 PM
Creation date
1/9/2015 2:07:03 PM
Metadata
Fields
Template:
City Council
Document Type
Resolutions
Meeting Date
6/4/2012
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-- t; <br />RESOLUTION 2012-11 <br />APPROVING A SITE PLAN FOR XCEL ENERGY INC. FOR A TRAINING <br />BARN ON THE PROPERTY LOCATED AT 13620 FENWAY BOULEVARD <br />NORTH <br />WHEREAS, Xcel Energy Inc., requested approval of a site plan for a 15,400 square foot <br />training barn. <br />Lot 1, Block 1, Roy Molitor Addition <br />WHEREAS, the Planning Commission has reviewed said site plan on May 24, 2012, and <br />recommends approval subject to the conditions listed in this resolution. <br />NOW, THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF <br />THE CITY OF HUGO, MINNESOTA, that it should and hereby does approve the site <br />plan for Xcel Energy Inc., for a 15,400 square foot training barn with the following <br />findings: <br />1. All items on the Engineer's memo and "red -line" detailed engineering comments that <br />have been sent directly to the applicant's engineer dated May 15, 2012, shall be <br />addressed. <br />2. The applicant will be responsible for maintaining stormwater facilities and vegetation <br />proposed as a part of the project. A maintenance agreement between the City and the <br />applicant shall be reviewed and approved by the City then recorded against the <br />property prior to the start of grading activities on the site. <br />3. The applicant shall be required to apply for formal site plan approval for all future <br />phases to be considered by the Planning Commission and City Council. This includes <br />the addition of any small house simulators. <br />4. Exterior storage of equipment shall be located on a paved surface and screened. <br />5. At anytime the fumes from the outdoor gas training become a nuisance; Xcel Energy <br />Inc., shall take action to abate the issue. At anytime as requested by the City, Xcel <br />Energy Inc agrees to notify the surrounding property owners of gas training. <br />6. The areas of the trail along Fenway Boulevard that are disturbs to construct the <br />accesses into the site shall be restored to the City's satisfaction. <br />7. Prior to the installation of any signs, the applicant shall obtain a sign permit. <br />8. There shall be no mesh screening on the black chain link fencing. <br />Prior to the issuance of a building permit: <br />
The URL can be used to link to this page
Your browser does not support the video tag.