My WebLink
|
Help
|
About
|
Sign Out
Home
2012.06.04 RESO 2012-11
Hugo
>
City Council
>
City Council Resolutions
>
2012 CC Resolutions
>
2012.06.04 RESO 2012-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2017 2:04:46 PM
Creation date
1/9/2015 2:07:03 PM
Metadata
Fields
Template:
City Council
Document Type
Resolutions
Meeting Date
6/4/2012
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f� • <br />Resolution 2012-11 <br />Page 2 <br />9. The applicant shall submit cut sheets for the wall mounted light fixtures to be <br />reviewed and approved by staff. <br />10. The applicant shall submit the final building material colors for the building to be <br />reviewed and approved by staff. <br />11. The internal roof drainage system that shall be integrated into the building design and <br />shall be reviewed and approved by staff. <br />12. The trash enclosure shall be screened with materials consistent with the building <br />material and shall be reviewed and approved by staff. <br />Prior to issuance of a Certificate of Occupancy: <br />13. All roof top mechanical equipment and ground equipment shall be screened from <br />view of adjacent properties. Staff shall perform an inspection when equipment is <br />installed to ensure compliance with City code. <br />14. The applicant shall submit a design for the ground cover for review and approval by <br />staff. An installation and maintenance schedule from the contractor installing and <br />maintaining the ground over shall be reviewed and approved by staff. <br />15. All required landscaping shall be fully installed. <br />16. Drainage and utility easements shall be dedicated to the City over the pre-treatment <br />basin and sewer extensions. <br />ADOPTED by the City Council this 4th day of June, 2012. <br />ATTEST: <br />Michele Lindau, City Clerk <br />L <br />iron, Mayor <br />
The URL can be used to link to this page
Your browser does not support the video tag.