My WebLink
|
Help
|
About
|
Sign Out
Home
2008.04.21 RESO 2008-0013
Hugo
>
City Council
>
City Council Resolutions
>
2008 CC Resolutions
>
2008.04.21 RESO 2008-0013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2017 2:04:33 PM
Creation date
1/12/2015 1:50:52 PM
Metadata
Fields
Template:
City Council
Document Type
Resolutions
Meeting Date
4/21/2008
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0. <br />Resolution 2008-13 <br />Page 2 <br />7. Drainage and utility easements will be provided over the wetlands and ponds up to <br />the 100 year high water level and over the proposed sanitary sewer, storm sewer and <br />water main lines as shown on the preliminary plat. <br />8. Sanitary sewer and water main service is available to the proposed development from <br />Rosemary Way. The applicant must work with the City Engineer to finalize these <br />connection details prior to approval of the final plat. <br />9. The developer must comply with all conditions outlined in the City Engineer's memo <br />dated March 31, 2008. <br />WHEREUPON, said Resolution was declared duly passed and adopted by the City <br />Council for the City of Hugo this 21" day of April, 2008 <br />ATTEST: (� <br />Michele Lindau, City Clerk <br />CA&Aion, Mayor <br />
The URL can be used to link to this page
Your browser does not support the video tag.