Laserfiche WebLink
Resolution 2006-14 <br />Page 3 <br />f. The applicant shall vacate the existing easement for the telecommunications tower <br />and provide a new easement over the existing tower as shown on the plans. The <br />easements shall be filed at Washington County and copies shall be provided to the <br />City of Hugo. <br />g. The developer must obtain all necessary wetland permits from the City of Hugo. <br />h. The developer shall comply with the City standards for street lighting within the <br />public right-of-way. <br />i. The landscape plan must be revised to comply with the ordinance requirements in <br />Section 1175-140.1% which requires two overstory deciduous trees in the front <br />yard of each home site. <br />j. Exterior liglMng shall be consistent throughout the development. All lighting <br />shall be shielded to prevent glare and light trespass, as required by Section 1195- <br />410 of the ordinance. Lighting details should be submitted for City review and <br />approval. <br />k. Signage shall comply with ordinance standards. <br />I. The development shall comply with the Fire Chief s requirements regarding fire <br />flow calculations, the location of fire hydrants, fire department connections, and <br />fire lane signage. <br />m.. The right-of-way and street width for all roads shall be as shown on the plans. <br />n. A 33 -foot %2 right-of-way shall be dedicated for 130* Street. <br />o. The plat shall comply with the City's street noming system, except as otherwise <br />approved by the City Council. <br />p. Street turharounds shall be reviewed by City staff and temporary' turnarounds <br />must be provided by the applicant as determined necessary by City staff. <br />q. A minimum of two parking stalls shall be provided for each lot. <br />r. Trails shall be provided through out the development as shown on the plans <br />submitted by the applicant on February 16, 2006, except as amended by this <br />resolution. <br />s. The applicant must finalize the trail location and obtain all required permits for <br />construction of the trail. The trail shall be constructed by and paid for by the <br />applicant with this plat. <br />