My WebLink
|
Help
|
About
|
Sign Out
Home
2003.01.21 RESO 2003-0004
Hugo
>
City Council
>
City Council Resolutions
>
2003 CC Resolutions
>
2003.01.21 RESO 2003-0004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2017 2:04:09 PM
Creation date
1/13/2015 4:18:49 PM
Metadata
Fields
Template:
City Council
Document Type
Resolutions
Meeting Date
1/21/2003
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
v <br />w <br />Resolution 2003-4 <br />Page 2 <br />8. Prior to final plat, the applicant shall provide the City the necessary written approvals <br />from Koch Pipeline Company for the encroachments into the existing gas line <br />easement. The approvals must allow the City to encroach into the gas line easement <br />for any required work in the public right-of-way for Street A. <br />9. The developer shall provide B6-18 barrier curb on all public streets. <br />10. The private driveways serving the townhome units shall be a minimum of 21 feet <br />long, but should be 22 feet long where possible. <br />11. Shared driveways serving the townhome buildings may be reduced to 20 feet wide. <br />Driveway J connecting to Street A shall remain 22 feet wide. <br />12. No parking is permitted on the shared driveways. <br />13. The developer shall incorporate different paving materials, signage or some other <br />treatment to demarcate the shared driveways. <br />14. Boulevard plantings must be provided on both sides of Street A. <br />15. Sidewalks shall be provided along Driveway G, H and J and shall be extended to <br />Street A, where mid -block connections will be provided to the sidewalk on the east <br />side of Street A. The developer shall work with staff to determine the final locations. <br />16. Pedestrian connections must be provided between the townhomes on Block 2 and the <br />planned commercial development. <br />17. Cross access and maintenance agreements shall be recorded with the final plat for all <br />shared private driveways or streets. <br />18. The plans shall note the ordinary high water and 100 -year high water elevation for all <br />water bodies. <br />19. The plans must identify normal water level, high water level and emergency overflow <br />for the ponds. <br />20. Utility plans and details must be submitted. <br />21. The development shall comply with the Fire Chief's requirements regarding fire flow <br />calculations, the location of fire hydrants, access, fire protection and fire lane signage. <br />22. A fence or wall must be provided on top of the six-foot retaining wall shown on <br />Outlot B near Driveway J. <br />
The URL can be used to link to this page
Your browser does not support the video tag.