My WebLink
|
Help
|
About
|
Sign Out
Home
2003.05.19 RESO 2003-0025
Hugo
>
City Council
>
City Council Resolutions
>
2003 CC Resolutions
>
2003.05.19 RESO 2003-0025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2017 2:04:10 PM
Creation date
1/13/2015 4:19:47 PM
Metadata
Fields
Template:
City Council
Document Type
Resolutions
Meeting Date
5/19/2003
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Resolution 2003-25 <br />Page 3 <br />8. The final plat must be revised to include the drainage and utility easement across Lot <br />14, Block 2 required per the construction drawings for the emergency overflow from <br />the rear yard area of Block 2. <br />9. The final plat must be revised to include the required drainage and utility easement <br />across the south end of Lot 29, Block 1 per the construction plan easements over the <br />emergency overflow from the intersection of Goodview Trail North. <br />10. The final plat shall be revised to include the required drainage and utility easement <br />across Lot 45, Block 1 over the sanitary sewer and watermain. <br />11. The final plat shall be revised to include the a 30 -foot wide drainage and utility <br />easement between Lots 21 and 22, Block 1 to provide adequate separation for <br />utilities. <br />12. The applicant shall request a vacation of the existing ponding and flowage easement <br />on the west end of the subdivision. The easement must be vacated prior to release of <br />the final plat. <br />13. The developer shall work with City staff to coordinate construction with the City <br />ditch project. <br />14. The developer must obtain all necessary permits from Rice Creek Watershed District. <br />15. Final utility plans and details must be submitted for review and approval by City staff <br />prior to release of final plat. <br />16. Final construction plans, including drainage documents, must be submitted for review <br />and approval by City staff prior to release of final plat. <br />ADOPTED by the City Council this 19" day of May 2003. <br />ATTEST: <br />Glc. <br />Mary eCreager, City Cler <br />
The URL can be used to link to this page
Your browser does not support the video tag.