Laserfiche WebLink
Planning Commission Minutes — April 14, 2005 <br />Page 3 of 5 <br />Schumann suggested a fence on three sides with a full compliment of landscaping. <br />Hoffbeck asked Nugent when he felt he would need to make use of the back storage area. <br />Nugent said it would probably be within a few years. <br />Rosenquist pointed out that that center spaces of the building probably would not meet the <br />handicap requirements for parking. <br />Nugent said he would rather pave the whole thing instead of fencing. He pointed out the other <br />properties in the park. The CCD informed him that staff was addressing issues on the <br />neighboring properties. <br />Bailly referred to the design of the building and said she felt it would be difficult to lease the <br />center area. <br />Hoffbeck asked if Nugent planned on eventually taking over the entire building and Nugent said <br />he did. <br />Schumann explained that industrial tax base created a source of revenue for the City and that was <br />why the City was concerned about the future tenants. <br />Weidt asked what type of business and equipment Reinhart would have. <br />Reinhart said they do striping, sweeping, and seal -coating with bobcats, trailers, sweepers, and <br />miscellaneous trucks. <br />Weidt asked what the bays would be used for. Nugent said they would be for maintenance. He <br />informed the Commission that he used environmentally friendly chemicals they would probably <br />be stored outside. <br />Weidt agreed that it would not be conducive to put a fence on the west side of the storage area. <br />He suggested the fence be pushed to the back with slats and more shrubbery. The parking could <br />be lengthened 20 feet. <br />Larrive said he would like to see the fence constructed to the property line with the berm inside <br />the fence. <br />Schumann pointed out that the fence would also provide a sound barrier. <br />Weidt asked if all the equipment would be secured. <br />Nugent said he would like to see the whole site secured but he needed to work with the property <br />owner to the south to see if they would help pay for a fence. <br />