My WebLink
|
Help
|
About
|
Sign Out
Home
2014.04.24 PC Packet
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2014 PC Packets
>
2014.04.24 PC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2015 11:06:15 AM
Creation date
2/20/2015 12:37:11 PM
Metadata
Fields
Template:
Commissions
Meeting Date
4/24/2014
Document Type
Agenda/Packets
Commission Name
Planning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AN&Wlnres, 1'dc. Infrastructure ■ Engineering ■ Planning s Construction 701 Xenia Avenue South <br />Suite 300 <br />Minneapolis, MN 55416 <br />Tel: 763-541-4800 <br />Fax: 763-541-1700 <br />April 18, 2014 <br />Ms. Rachel Juba <br />City Planner <br />City of Hugo <br />14669 Fitzgerald Avenue North <br />Hugo, MN 55038 <br />Re: Site Plan Review <br />Orchard Hills Senior Housing <br />W SB Project No. 1904-62 <br />Dear Ms. Juba: <br />We have completed our review of the Orchard Hills Senior Facility site plan. The following <br />information was received for review: <br />■ Preliminary Plat for LaValle Fields prepared by EG Rud and Sons dated April 9, 2014 <br />■ Grading, Drainage, Utility, and Erosion Control Plan prepared by Plowe Engineering <br />dated April 10, 2014. <br />Preliminary Subsurface Soil Investigation prepared by Interstate Geotechnical <br />Engineering dated December 7, 2012. <br />■ Drainage Calculations prepared by Plowe Engineering, dated April 10, 2014 <br />A summary of our findings is provided as follows: <br />Utilities <br />1. Sanitary sewer and water service is available to the site along the property boundary. The <br />sanitary sewer and watermain will be extended within the site, and designed such that it can <br />serve future development phases. A portion of the sewer and water improvements will be <br />owned and maintained by the City following construction and acceptance of the <br />improvements. Drainage and Utility easements over the public utility segments will be <br />included on the Final Plat for LaValle Fields. <br />Stormwater Manazement <br />1. Stormwater runoff for the LaValle Fields plat as a whole will be collected in anew storm <br />sewer system. The system will discharge to a new pond located on the ditch alignment east <br />of Oneka Parkway, which will be constructed during the next phase of the project. The <br />stormwater facility, once constructed, will serve the entire development, as well as runoff <br />f+•��N¢r�w�,ure:anwne,�csse-rf�-o, JhmdAl7frotls)xdar <br />
The URL can be used to link to this page
Your browser does not support the video tag.