My WebLink
|
Help
|
About
|
Sign Out
Home
2013.12.19 PC Packet
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2013 PC Packets
>
2013.12.19 PC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2015 1:12:47 PM
Creation date
2/20/2015 1:11:56 PM
Metadata
Fields
Template:
Commissions
Meeting Date
12/19/2013
Document Type
Agenda/Packets
Commission Name
Planning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Resolution 2014 - <br />Page 4 <br />of the ordinance. Lighting details should be submitted for City review and <br />approval to ensure a 90 -degree cut off is provided and bulbs are not visible. <br />Exterior lighting shall be directed down and shielded from adjacent properties and <br />roadways. <br />k. The maximum height of parking lot lighting adjacent to residential areas shall be <br />20 feet. <br />Signage <br />1. The applicant shall provide an overall sign plan for the development. <br />Streets, Parking and Utilities <br />in. The parking calculations for the senior housing facility shall consider the office <br />area. The calculations shall be reviewed and approved by staff. <br />n. The parking lots within the development shall meet Section 90-253 of the <br />ordinance. <br />o. Construction details of the fire lane for the senior housing facility shall be <br />reviewed and approved by staff. <br />Sidewalks and Trails <br />p. The sidewalks within the development shall be interconnected and connect to the <br />public trail through the development: <br />q. A 10 foot wide trail easement shall be dedicated for the public trail. The exact <br />trail location shall be reviewed and approved by staff. <br />r. The trail location shall be setback 10 feet from the neighboring property to the <br />west. <br />s. A trail shall be installed on 147' Street with the construction of the road. <br />Miscellaneous <br />12. The applicant shall comply with all conditions in the City Engineer's letter dated <br />December 12, 2013. <br />13. The applicant must comply with the following, prior to release of the final plat for <br />recording: <br />
The URL can be used to link to this page
Your browser does not support the video tag.