MINUTES FOR THE PLANNING COMMISSION MEETING OF 2-24-99
<br />The meeting was called to order by Planning Commission member Schumann at 7:00 PM.
<br />PRESENT: Kellison, Kleissler, Malaski, Peltier, Schumann, Puleo
<br />City Administrator, Robert Museus
<br />Deputy Clerk, Michele Lindau
<br />Schumann made motion, Peltier seconded, to approve the minutes of January 27, 1998, as amended.
<br />Ayes: Kellison, Kleissler, Peltier, Schumann, Puleo
<br />Abstain: Malaski
<br />Motion carried.
<br />Beaver Ponds -Second Addition
<br />Oakwood Land Development Company, 1611 Highway 10, Spring Lake Park, MN, requested to develop the second phase of the
<br />Beaver Ponds Subdivision consisting of 32 townhomes along the south side of 130th St., east of Flay Avenue.
<br />Puleo read the public notice as published in the White Bear Press, and opened the meeting for public comment.
<br />Mr. John Peterson, owner of the Oakwood Land Development Company, presented the new plan showing the change in the
<br />number of townhomes. Previous preliminary plat approval for Phase 2 & 3 provided for four -unit townhomes in Phase 2. Mr.
<br />Peterson requested to change it to two unit townhomes. He also cited a change in the buildings along the wetlands in Phase 4.
<br />Tom Jackson, owner of a triangular section of land west of Phase 4, expressed his concern regarding sewer access, and requested
<br />the sewer be set at such an elevation to ensure it would be available to serve his property, and requested the charges to dump into
<br />the lift station be recalculated.
<br />Mr. Peterson responded by saying the sewer line would serve all of the Jackson property but only a portion of the Jesperson
<br />property.
<br />Jerry Hauble, 5460 125th St. N., would like the sewer elevations and gravity -feed system designed appropriately to
<br />accommodate his 80 acres to the south.
<br />Warren Arcand, 5510 130th St., was concerned about how his property to the north would be affected by the sewer line.
<br />Kevin Peltier, 13194 Goodview Ave. N, asked if the sewer hookups on the east end of their property line would change from the
<br />previously -approved Phase 2 plans. The City Administrator stated it should not affect his property and that the City Engineer
<br />was aware of Mr. Peltier's concerns.
<br />Puleo closed the public hearing.
<br />Kellison expressed approval of the reduction in density, but was concerned about how the roads will connect to future
<br />development in the area. Schumann stated Ferrara Avenue should be constructed all the way to the property line of the
<br />development.
<br />Schumann made motion, Malaski seconded, to recommend approval of Beaver Ponds Second Addition subject to the Findings of
<br />Fact and Recommendations.
<br />Ayes: Kellison, Kleissler, Malaski, Schumann, Puleo
<br />Nay: Peltier
<br />Motion carried.
<br />Special Use Permit -Wayne Scanlan
<br />Wayne Scanlan, 5379 Grand Ave., White Bear Lake, applied for a special use permit to construct a 44'X 70' horse barn, to
<br />replace an existing 40' X 120' horse barn, prior to construction of a house on the lot. The property is located in the Lakeshore
<br />Zoning District of Horseshoe Lake. Hugo City Code, Chapter 320-5, Subd. 8(1), states that no accessory building or use shall be
<br />constructed on a lot prior to the time of construction of the principal building to which it is accessory, except by special use
<br />permit.
<br />
|