My WebLink
|
Help
|
About
|
Sign Out
Home
1978.05.24 PC Minutes
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Minutes
>
1978 PC Minutes
>
1978.05.24 PC Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2015 4:36:09 PM
Creation date
2/27/2015 12:52:44 PM
Metadata
Fields
Template:
Commissions
Meeting Date
5/24/1978
Document Type
Minutes
Commission Name
Planning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES OF THE PROCEEDINGS <br />OF THE <br />HUGO PLANNING COMMISSION <br />May 24t 1978 <br />The meeting was called to order by Chairman Ehret at 8:03 PM. <br />PRESENT: Ehret, Peloquin, Peltier, Woeltge, Gillen, and McAllister <br />Larry Irsfeld, City Council, was also present. <br />ABSENT: Greger <br />Motion made by Peloquin, seconded by Peltier, to approve the minutes of May 10, 19781, <br />after the following changes have been made: <br />Page 2 2nd paragraph) - prior to the adoption of the Zoning Ordinance <br />Page 2 Ray Neeser) - stamp the land division with the approval of the City Council <br />Page 3 Carl Dale) - Mr. Dale will be notified when the contract is signed. <br />Page 4 �Hollihan) - McAllister voted no because he felt documentation would be incomplete <br />All aye. Motion Carried. <br />FISCHER CONSTRUCTION - MINING PERMIT <br />Residents of Evergreen Hills presented the Planning Commission with a list of names <br />stating their complaints regarding the Fischer operation, listed as follows: <br />1. Operating before 7 A.M. and after 7 P.M. <br />2. Excessive noise <br />3. Excessive speed on 8A <br />4. Odor <br />Mr. Fischer was present, and stated that up to now, he was unaware of any problems <br />with the mining operation. B -Tu -Mix operates that hot mix plant at his pit, and <br />Ehret informed Fisher that it was his responsiblity to see they operate under thf- <br />terms of the permit. The noise problem is created by a generator needed to keep' <br />the oil hot for the next days work. The speed problem will have to be investigated <br />by the sheriff's office because 8A is a county road. As for the odor, Mr. Fisher <br />said that PCA had not no trouble with their operation. <br />Mr. Vincent Verrecchio, 14107 Hyde Avenue, said the major concern of the Deo le was <br />the constant manufacturing throughout the night. He stated that he lives 17 of <br />a mile west of the pit. <br />Donna Goetl, 14481 Hyde Avenue, inquired into the possibility of expansion. Ehret <br />said the permit would have to be reviewed if they request expansion. <br />Herb Foot, 14425 Hyde, stated that no one was informed of a public hearing last year. <br />Ehret told Mr. Foot that hot mix plants are included in Mining Permits, and a public <br />hearing is not required. <br />Dave Kirk, 14359 Hyde Avenue, wondered how long they would have to put up with the <br />noise, and Ehret said they would request a report from the Police Department, and <br />request Mr. Fischer to bring the noise problem under control. <br />
The URL can be used to link to this page
Your browser does not support the video tag.