My WebLink
|
Help
|
About
|
Sign Out
Home
2016.06.23 PC Packet
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2016 PC Packets
>
2016.06.23 PC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2016 4:31:02 PM
Creation date
6/20/2016 4:28:55 PM
Metadata
Fields
Template:
Commissions
Meeting Date
4/28/2016
Document Type
Agenda/Packets
Commission Name
Planning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BETP 6th Preliminary Plat <br />Page 3 <br />The property is within the drainage area of the Bald Eagle Industrial Park Pond project <br />completed when the Industrial Park was developed. As a result, a portion of the stormwater <br />storage and treatment requirements are met. The Rice Creek Watershed Districts (RCWD) rules <br />have changed since the Industrial Park was developed, and the volume reduction requirements <br />will apply as the sites develop, as well as providing storage for larger rain events. This will be <br />reviewed as development is proposed for each parcel. <br />The City storm.water trunk fee will apply to these parcels, and will be calculated and collected at <br />the time of building permit. <br />Utilities <br />Sanitary sewer sen ice is available within Fenway Boulevard via the Met Council Environmental <br />Services (MCES) Forest Lake Interceptor. Direct connection to the MCES sewer is not allowed; <br />however, the plat documents show sewer stubs near the south property line of Lot 2 and the north <br />property line of Lot 1. These stubs should be verified by the applicant before any development <br />occurs on site. One or both stubs could be used to provide individual service to each lot, or a <br />public sewer extension could be extended from one of the stubs to provide service to both lots. <br />This issue will be reviewed in detail once development of one or both lots occurs. <br />Water service is available to both properties from within Fenway Boulevard. The specifics of <br />the connections will be reviewed as development of the lots occurs. <br />All utility connection fees will apply to both lots within the subdivision, and will be <br />calculated/collected at the time a building permit is issued. <br />StreetslA cc ess <br />The property has direct access to Fenway Boulevard, and driveway connections can be made at <br />the time the properties are developed. The specific driveway locations and details will be <br />reviewed at the time the properties are developed. <br />The properties have a 60 -foot wide roadway easement across the east property line, and the <br />easement continues south to 130'h Street as Farnham Avenue. The easement currently does not <br />have an improved roadway between 130'' Street and the property. The easement could be used <br />to provide access to the site; however, a roadway to City standards would need to be constructed <br />to do so. <br />Park Dedication <br />Park dedication fees do not apply to industrial properties. <br />2. CONCLUSION/RECOMMENDATION; <br />It's in staff's opinion that all necessary requirements have been met to approve a preliminary <br />plat. <br />
The URL can be used to link to this page
Your browser does not support the video tag.