My WebLink
|
Help
|
About
|
Sign Out
Home
2011.10.12 Parks Packet
Hugo
>
Community Development
>
Parks
>
Parks Commission
>
Parks Commission Agenda/Packets
>
2011
>
2011.10.12 Parks Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2016 8:52:13 AM
Creation date
6/23/2016 8:20:37 AM
Metadata
Fields
Template:
Commissions
Meeting Date
10/12/2011
Document Type
Agenda/Packets
Commission Name
Parks
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Field Services Division <br />r Services Provided: <br />GolfTurf o Golf Irrigation • Pump Stations • Control Systems • Weather Stations <br />C 0 M R A N 1 E s Sports Turf • Irrigation • Renovation -Clay Work • Lime • Maintenance <br />Erosion Silt Fence • Floatation Curtain • Slope Protection -Erosion Seeding <br />Native Seeding • Rain Gardens • Maintenance • • Drainage • • Design <br />Date. 9/15/2017. From: Jay Stactler <br />To: Gary Wilson 651-765-1122 Direct <br />Project: Irish Meadows Cross Country Complex 651-248-7626 Mobile <br />Project ID: jays( frattalonecompanies,com <br />LINE 4 DESCRIPTION Qty U of M Unit Price '1 OTAL <br />Irish Meadows Proposal <br />Scope of Work - <br />To create a Destination Cross Country Running Complex that will enable the Irish Meadows Committee <br />to solicit and promote events to be held on site ranging from high school meets to the largest NCAA <br />sanctioned events. <br />Process: <br />In this proposal 1 have estimated the following as required processes in order to create <br />the cross country trail, <br />1.00 Herbicide Application - apply non-selective herbicide to the proposed trail area. Eradicate existing <br />vegetation. <br />2.00 Grade areas of the trail system that require fine tuning, grub cleared areas of the trails, 3 clay allowance. <br />3.00 Chisel plow the proposed trail area in an effort to turn existing soils over to create a blackened soil <br />__. _..-........ ....- <br />i:onditicin. <br />4.00 Disk/cultivate blackened soils to mellow seed bed roughened by chisel plowing. <br />5.00 Apply a pre -plant fertilizer analysis 17-17-17, <br />6.00 Pulvimulch disked soils to further refine the seed bed. <br />7.00 Seed the newly created trail area with a turf mix applied at a rate of 200 pounds per acre. <br />*Seed Mixture to be MNDot Seed Mix 260CT (Commercial Turf) <br />8.00 Straw mulch seeded areas with clean straw mulch material; disk anchored. <br />To Furnish and Install the Above Mentioned 1.00 LS $ 23,575.00 <br />Services. <br />Proposal Exclusions: <br />Mowing of the trail system prior to the herbicide application. To a height of 4" by others. <br />Rock picking/debris removal once item 6 is completed. We discussed a volunteer day to help. <br />Tree clearing, staking, surveying or removal of contaminated materials if found on site. <br />Culverts for trail crossings in low lying areas, drain tile or utility work. <br />Import of topsoil - site grading to balance without excessive hauling. <br />Maintenance of seeded areas. <br />It has been a sincere pleasure working with you on the creation of this proposal! <br />Thank you and please contact me with any questions, <br />Jay Stadler <br />Division Manager, Field Services <br />Our Expectation is to Exceed Yours <br />3205 Spruce Street - St. Paul, MN 55117 -651-484-0448 fax 651-484-7839 <br />
The URL can be used to link to this page
Your browser does not support the video tag.