Laserfiche WebLink
40 <br />Preliminary Master Plan Cost Estimate <br />Lions Park - City of Hugo, MN <br />Brauer & Associates, Ltd. <br />Project #1904-390 <br />This cost estimate defines the estimated costs associated with each component of the master plan update for Lions Park. It is based on a combination <br />of site-specific development requirements and projects of similar size and complexity. These estimated costs are also based on having the work <br />completed by private contractors and specialists. It does not take into consideration work that could be performed by City staff, volunteer groups, or <br />by other means. <br />The cost figures are based on master plan level evaluation, which brings with it inherent limitations. The cost figures are meant for general budgeting <br />purposes, project phasing, and comparing the relative cost of one item to that of another. The costs are in 2012 dollars. Although intended to be <br />conservative, actual costs will vany depending on the year that each aspect of the master plan is implemented, implementation parameters, economic <br />conditions affecting bidding, and unexpected site conditions found in the field during construction. <br />Park Ira rovement Description <br />Cost Range Estimate <br /># <br />1- Removals Earthwork and Surveying <br />Low <br />Hi h <br />1 <br />Removals <br />30,000.00 <br />34,500.00 <br />2 <br />jEarthwork operations(including erosion control) <br />40,000.00 <br />46,000.00 <br />3 <br />Survaing <br />10 000.00 <br />11 500.00 <br />Estimated Subtotal (includes 10% contingency and 15% testing, ed's, and surveying fees) <br />$100,000.00 <br />$115,000.00 <br /># <br />2 - Utilities, Light nand Irrigation Improvements <br />Low <br />HiRh <br />1 <br />Utility adjustments <br />30,000.00 <br />34,500.00 <br />2 <br />General Lighting Improvements and electrical upgrades (budget) <br />200,000.00 <br />230,000.00 <br />3 <br />Irrigation modifications and expansion (budget) <br />50,000.00 <br />57,500.00 <br />Estimated Subtotal (includes 10% contingency and 75% testing, ed's and surveying fees) <br />$350,000.00 <br />$402,500.00 <br />q <br />3 - Park Improvements <br />Low <br />Hi h <br />1 <br />4" thick concrete pavement <br />23,000.00 <br />26,450.00 <br />2 <br />Event vehicular access points concrete apron and walkway) <br />31,200.00 <br />35,880.00 <br />3 <br />Asphalt trail <br />137,500.00 <br />158,125.00 <br />4 <br />Parking lot improvements (includes pavement, curbing, striping and signage) <br />100,000.00 <br />115,000.00 <br />5 <br />Asphalt parking bas with concrete curb and gutter <br />70,000.00 <br />80,500.00 <br />6 <br />1/2 court basketball with striping <br />10,000.00 <br />11,500.00 <br />7 <br />Skate Park includes concrete pavement, 6' hi h fencing, and relocation ofequipment)-55,000.00 <br />63,250.00 <br />8 <br />Fountain wall <br />63,000.00 <br />72,450.00 <br />9 <br />Decorative fountain (budget) <br />20,000.00 <br />23,000.00 <br />10 <br />Trash receptacle <br />9,600.00 <br />11,040.00 <br />11 <br />Bike rack <br />4,500.00 <br />5,175.00 <br />12 <br />Picnic table (does not include tables under main park building) <br />30,000.00 <br />34,500.00 <br />13 <br />Bench seating <br />15,600.00 <br />17,940.00 <br />14 <br />Drinking foumain (assumes water source nearby) <br />5,000.00 <br />5,750.00 <br />15 <br />36" high decorative fencing <br />50,000.00 <br />57 500.00 <br />16 <br />12" wide concrete maintenance strip for decorative fencing <br />600000 <br />6,900.00 <br />17 <br />Park & City Hall Sculpture / Sign40,000.00 <br />46,000.00 <br />18 <br />Play area concrete curbing <br />12,600.00 <br />14,490.00 <br />19 <br />Play area oared -in- lace surfacing <br />78,000.00 <br />89,700.00 <br />20 <br />Wood fiber safety surfacing <br />7,500.00 <br />8,625.00 <br />21 <br />Play ui ment(bud et) <br />75,000.00 <br />86,250.00 <br />22 <br />Picnic Shelter (budget) <br />40,000.00 <br />46,000.00 <br />23 <br />Multi-purpose building (includes 2 restroom, kitchen, storage, open-air pavillion, stage) <br />750,000.00 <br />1,000,000.00 <br />24 <br />Turf reinforcement for building service drives <br />26,400.00 <br />30,360.00 <br />25 <br />Turf restoration <br />27,000.00 <br />31,050.00 <br />26 <br />Tree and shrub plantings <br />20 000.00 <br />23 000.00 <br />Estimated Subtotal (includes 10% contingency and 15% testing, ed's and surveying fees) <br />$2,133,625.00 <br />$2,625,543.75 <br />Total estimated construction cost: 1 <br />$2,583,625.00 <br />$3,143,043.75 <br />Brauer Associates. Ltd. KI01904-39ML-ArchIDOCSI'1904-390Lionr Park -m,v,, pion carr.,, Page I ort <br />