My WebLink
|
Help
|
About
|
Sign Out
Home
2013.09.11 Parks Packet
Hugo
>
Community Development
>
Parks
>
Parks Commission
>
Parks Commission Agenda/Packets
>
2013
>
2013.09.11 Parks Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2016 3:31:20 PM
Creation date
6/23/2016 9:21:59 AM
Metadata
Fields
Template:
Commissions
Meeting Date
9/11/2013
Document Type
Agenda/Packets
Commission Name
Parks
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The next steps... <br />Master planning for the proposed improvements was the first step in making the public's ideas become reality. This level of design sets the purpose, <br />goals and general guidelines for the project. As funding becomes available to proceed with part or all of the improvements, design refinements will <br />be required. The process of design is intended to raise and answer questions in a logical manner. Working from the broad concepts fmmed by the <br />Master Plan to the detail of construction documents, each step is intended to give affected parties the information required to proceed or revise the <br />design. In order of refinement, the following are the normal steps taken toward realizing the proposed improvements of any given project: <br />Schematic Design <br />This portion of the design process is intended to give the owner and others more detailed plans and sketches and cost estimates to allow for informed <br />decisions regarding space requirements, proportions, and appearance and cost alternatives. <br />Design Development <br />This step is a further refinement of drawings and estimates of cost. Issues concerning project systems should be explored along with material choices <br />and construction techniques. These alternatives and their probable cost/benefit must be investigated to insure a design that will be in compliance with <br />available funding and provide a project that is maintainable. The owner and consultant should review the design development documents with <br />affected agency reviewers to receive guidance on the projects potential approval, the approval process and the likely time required in formal agency <br />Construction Documents and Agency Review & Approvals <br />These documents are prepared for cost effective bidding or negotiation of the project construction and will form apart of any contract with a <br />contractor. All systems, materials and dimensions must be described and accurately depicted to give contractors guidance as to the final project <br />requirements. In addition to construction documents being used for construction they also are the final documents used in any agency approval <br />process. Potential agency / permit reviews may include the following: city grading, city building, city water connection, etc. <br />Brauer Associates, Ltd. K:101904-3901,-.4 ah1DOCSV 904-390Lions Park- master plan cost est Page 2 of2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.