My WebLink
|
Help
|
About
|
Sign Out
Home
2016.08.15 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2016 CC Packets
>
2016.08.15 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2016 2:22:12 PM
Creation date
8/15/2016 2:12:33 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
8/15/2016
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B <br />Project Budget <br />ESTIMATED COST <br />The preliminary estimated cost of construction is shown in the table below. It is estimated that the project <br />costs will total $522,000, including a 10% construction contingency and 20% indirect costs, as shown in <br />the table below. The cost of monitoring is not included. <br />Task <br />Estimated Cost <br />Storm Pond Cleanout <br />$95,000 <br />Pump System/Intake* <br />$64,000 <br />Forcemain Distribution and Irrigation Retrofit* <br />$189,000 <br />Educational Signs* <br />$4,500 <br />Mobilization, Erosion Control, and Site Restoration <br />$42,000 <br />Construction Subtotal <br />$394,500 <br />10% Contingency <br />$40,000 <br />Construction Total <br />$434,500 <br />20% Indirect <br />$87,000 <br />Total <br />$522,000 <br />*Indicates Metropolitan Council funded item <br />EXHIBIT B <br />
The URL can be used to link to this page
Your browser does not support the video tag.