Laserfiche WebLink
Mining Permit - Atkinson Pit <br />Page 3 of 5 <br />16. The sight distance along the haul routes shall be improved at the expense of the <br />permit holder according to the requirements of the City Engineer. <br />17. An updated contour map of the site is to be filed with the City Engineer, when <br />requested. <br />18. All existing trees and natural vegetation bordering the pit area shall be left <br />undisturbed. <br />19. All topsoil in the pit area shall be stockpiled, and used only for site restoration <br />purposes. <br />20. Sewer facilities on the site shall be of the portable, chemical holding -tank type. <br />21. No blasting shall be permitted on site. <br />22. Nuisances on site are to be abated pursuant to Chapter 46 of the City Code (junk <br />vehicles, illegal dumping, etc.). <br />23. Applicant shall refrain from mining below grade closer than fifty (50) feet to the <br />boundary of any zone where such activities are not permitted, or closer than fifty <br />(50) feet to the boundary. <br />24. Inspections are to be conducted on-site. <br />25. The Applicant shall carry liability and property damage insurance, with minimum <br />limits at $1,000,000.00 to any one person and $1,000,000.00 for any occurrence, <br />naming the City of Hugo as an additional insured. <br />3 <br />