My WebLink
|
Help
|
About
|
Sign Out
Home
2016.12.05 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2016 CC Packets
>
2016.12.05 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2016 9:48:26 AM
Creation date
12/2/2016 9:45:31 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
12/5/2016
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d. I&I Items <br />i. Evaluate extent, source, and significance of I&I (assuming no field work will be necessary) <br />ii. Define goals, policies, and strategies to address I&I <br />iii. Estimate costs for remediating I&I issues <br />iv. Estimated cost: $1,500 <br />e. Write chapter— Estimated cost: $5,500 <br />f. TOTAL sanitary sewer: $17,000 <br />3. Transportation —these items are required <br />a. Agency Involvement <br />i. Collaboration with Washington County and MnDOT <br />ii. Estimated cost: $2,000 <br />b. TAZ and Travel forecasts <br />i. Run Met Council model <br />H. Develop 2040 forecasts <br />iii. Allocate population, household, and employment by TAZ for 2020, 2030, 2040 <br />iv. Estimated cost: $2,800 <br />c. Roadways <br />i. Describe and map existing/future volumes, existing/future functional class and lanes <br />ii. Verify arterials in regional context, and identify/map capacity issues <br />iii. Identify planned improvements in Met Council TPP <br />iv. Incorporate Access guidelines — MnDOT and County <br />v. Include previous studies/recommendations <br />vi. Describe and map short and long range projects or studies <br />vii. Estimated cost: $4,000 <br />d. Biking/Walking <br />i. Describe and map existing and planned on and off-road bicycle facilities <br />H. Map and describe Regional Bike Transportation Network (RTBN) <br />iii. Identify pedestrian needs that respond to community designation <br />iv. Estimated Cost: $1,000 <br />e. Aviation (no airport within influence area) <br />ii. Identify policies that protect regional airspace from obstructions <br />ii. Recognize seaplane use on surface waters designated and regulated by MnDOT, if applicable <br />iii. Estimated Cost: $500 <br />f. Freight <br />i. Map railways, barge facilities, freight terminals as applicable <br />ii. Identify nodes that generate freight movement <br />iii. Collect and map HCAADT on arterial routes <br />iv. Identify freight bottlenecks <br />v. Estimated Cost: $2,500 <br />g. Transit <br />i. Describe transit market area, and map existing/planned transit infrastructure and services <br />ii. Estimated cost: $500 <br />h. PM/Write chapter — Estimated cost: $4,500 <br />i. TOTAL transportation: $17,800 <br />4. Mapping/GIS Services - $4,000 <br />Grand total - $51,300 <br />z <br />
The URL can be used to link to this page
Your browser does not support the video tag.