My WebLink
|
Help
|
About
|
Sign Out
Home
1994 January Newsletter
Hugo
>
Misc
>
Newsletters
>
1994 January Newsletter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2017 3:09:39 PM
Creation date
1/26/2017 3:09:38 PM
Metadata
Fields
Template:
Newsletters
Year
1994
MonthandSeason
January
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�. City Hall Newslettter <br /> --- - ----------------- <br /> ....... . <br /> City of <br /> City of Hugo, 5524 Upper 146th Street North, Hugo, MN 55038 . 429-6676 <br /> New Water Tower and Well <br /> At a cost of just under$1.4 million dol- in neighborhoods abutting County Rd.8A. <br /> lars, construction of the City s new water 2.The ability to provide water service to <br /> tower and well have been completed. With existing homes in the Bald Eagle Lake area <br /> 500,000 gallons of water storage capacity, and businesses in the Bald Eagle Industrial <br /> and the ability to pump 600 gallons per Park. <br /> minute, these water system improvements 3.Increased system reliability through multi- <br /> should handle the City's expected growth for ple sources of water storage. ; <br /> the foreseeable future. The project included 4.More responsive system maintenance by <br /> construction of the new water tower, well, allowing wells and towers to be isolated G <br /> and watermain to connect existing facilities with limited disruption of service. <br /> with the new improvements for an integrat- 5.Provide capacity to serve new growth in <br /> ed water system. It is expected that fees the community. <br /> charged to new homes and businesses con- During 1994, the water main on $" <br /> necting to the system will pay for the County Rd. 8A, between Highway 61 and <br /> -improvement in ten years. Benefits from the Goodview Ave., will be expanded in con- <br /> )rovements are: junction with the County's reconstruction of <br /> 1.Increased water pressure for fire protection the roadway as the final phase of this project. <br /> Egg Lake Road Construction <br /> County Rd. 8A, between Highway 61 and Goodview Ave., reconstruction are currently being prepared, and will be the <br /> will be reconstructed in 1994 by the Washington County subject of a public hearing in January. Tentative design fea- <br /> Public Works Dept. The road design has been the subject of tures include two, 12 foot driving lanes,a six foot safety shoul- <br /> two public meetings between residents along 8A,Washington der on the north side of the road,parking on the south side of <br /> County, and the City of Hugo. Preliminary plans for the the road,and construction of a parallel bike trail. <br /> MR Emm MWr oma.sanm AW <br /> 4 <br /> ©G,i�Uf�C� a nlC o 1[ i PQG OW.LMIE 7R? L <br /> (SWM CURB a CSU MR-=- CIRAM-1 <br /> Sam <br /> Volunteer Firefighters Needed See inside for the <br /> The Hugo Volunteer Fire Department is seeking members to provide fire <br /> lighting,emergency medical response,and other safety services to the commu- <br /> nity. Good physical health, a desire to serve the community, and the ability to results ' <br /> 1993 <br /> provide quick response to emergencies are necessities. Priority is being given <br /> to individuals who are available during the day and/or have medical training. Citizens Surve <br /> Applications may be obtained at the Hugo City Hall from 8:30AM to 3:OOPM, <br /> Monday through Friday. <br />
The URL can be used to link to this page
Your browser does not support the video tag.