Laserfiche WebLink
Resolution 2017-11 <br />Page 5 <br />r. A formula has been developed to determine the amount that the water trunk fee <br />can be reduced based on the water reuse system, which results in a 40% reduction <br />in the trunk fee. This provision will be included in the development agreement for <br />each phase. <br />s. A formula has been developed to determine the amount that the stromwater trunk <br />fee can be reduced based on the drainage provided for the construction of 130' <br />Street, which results in a 5% reduction in the trunk fee. This provision will be <br />included in the development agreement for each phase. <br />13. Prior to the issuance of building permits, the developer must comply with the <br />following conditions. <br />a. The applicant shall record the final plat, development agreement and all other <br />documentation at Washington County and provide the City with proof of <br />recording. <br />b. A Letter of Map Revision will need to be prepared and submitted for FEMA <br />approval so that the existing floodplain boundaries and elevations can be revised <br />per the plans. <br />c. The Stormwater Trunk fee shall be paid at each building permit. <br />ADOPTED by the City Council this 1 st day of May, 2017 <br />Tom Weidt, Mayor <br />ATTEST: <br />Mi bele indau, City Clerk <br />