My WebLink
|
Help
|
About
|
Sign Out
Home
2017.08.07 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2017 CC Packets
>
2017.08.07 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2017 3:03:17 PM
Creation date
8/8/2017 2:53:08 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
8/7/2017
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Hugo <br />Hugo Fire Station <br />5323 1401h Street North, Hugo, MN <br />SCOPE OF SERVICES <br />SPECIFICATION PREPARATION <br />ROOF <br />SPEC(mi. INC.' <br />July 13, 2017 <br />Page 4 <br />RSI Proposal #P17-12595-02 & 03 <br />Prepare re -roofing specifications and drawings that define the scope of demolition work, identify the <br />appropriate materials and quality control procedures, and address details. <br />Roof Spec, Inc. will verify the scope of work through our field verification process where access is <br />available. A drafting team will make test openings at various locations to verify the existing conditions. <br />This allows for accurate detailing of the existing conditions and enables us to provide a design package <br />for the new roof system obtaining bids on an apples to apples basis. We will then attempt to verify our <br />findings with any existing documentation available. Whenever possible, the existing insulation and roof <br />system components are re -used to minimize both the impact of re -roofing on the interior operations of <br />the facility and to reduce the overall project costs. <br />Samples of the existing roof system and flashings are submitted by a Minnesota Certified Asbestos <br />Inspector for laboratory analysis. The removal of any asbestos containing roofing materials is then <br />addressed in the project specifications. <br />Roof Spec, Inc. will design the new roof system by preparing a project manual with job specific <br />references to the roof areas. A set of detail drawings consisting of a site plan, roof plan, general notes <br />and pages of project specific details will also be provided. <br />Once construction documents are complete, Roof Spec, Inc. will solicit bids from preapproved <br />contractors and coordinate the scheduling of a pre-bid meeting. The purpose of a pre-bid meeting is to <br />conduct a guided walk-through of the facility roof and familiarize prospective bidders with the project. <br />Roof Spec, Inc. will then attend the bid opening, review the bid results and provide a bid tabulation and <br />recommendation of award. We then prepare a contract on AIA Document A101-2007 standard form of <br />agreement between Owner and Contractor where the basis of payment is a stipulated sum. If the owner <br />requests a different contract, we will adapt whatever version is required. <br />
The URL can be used to link to this page
Your browser does not support the video tag.