Laserfiche WebLink
City of Hugo <br />Hugo Fire Station <br />5323 1401h Street North, Hugo, MN <br />SCOPE OF SERVICES <br />SPECIFICATION PREPARATION <br />ROOF <br />SPEC(mi. INC.' <br />July 13, 2017 <br />Page 4 <br />RSI Proposal #P17-12595-02 & 03 <br />Prepare re -roofing specifications and drawings that define the scope of demolition work, identify the <br />appropriate materials and quality control procedures, and address details. <br />Roof Spec, Inc. will verify the scope of work through our field verification process where access is <br />available. A drafting team will make test openings at various locations to verify the existing conditions. <br />This allows for accurate detailing of the existing conditions and enables us to provide a design package <br />for the new roof system obtaining bids on an apples to apples basis. We will then attempt to verify our <br />findings with any existing documentation available. Whenever possible, the existing insulation and roof <br />system components are re -used to minimize both the impact of re -roofing on the interior operations of <br />the facility and to reduce the overall project costs. <br />Samples of the existing roof system and flashings are submitted by a Minnesota Certified Asbestos <br />Inspector for laboratory analysis. The removal of any asbestos containing roofing materials is then <br />addressed in the project specifications. <br />Roof Spec, Inc. will design the new roof system by preparing a project manual with job specific <br />references to the roof areas. A set of detail drawings consisting of a site plan, roof plan, general notes <br />and pages of project specific details will also be provided. <br />Once construction documents are complete, Roof Spec, Inc. will solicit bids from preapproved <br />contractors and coordinate the scheduling of a pre-bid meeting. The purpose of a pre-bid meeting is to <br />conduct a guided walk-through of the facility roof and familiarize prospective bidders with the project. <br />Roof Spec, Inc. will then attend the bid opening, review the bid results and provide a bid tabulation and <br />recommendation of award. We then prepare a contract on AIA Document A101-2007 standard form of <br />agreement between Owner and Contractor where the basis of payment is a stipulated sum. If the owner <br />requests a different contract, we will adapt whatever version is required. <br />