My WebLink
|
Help
|
About
|
Sign Out
Home
2017.08.07 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2017 CC Packets
>
2017.08.07 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2017 3:03:17 PM
Creation date
8/8/2017 2:53:08 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
8/7/2017
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
477 Temperance Street I St. Paul, MN 55101 1 (651) 286-8450 <br />August 2, 2017 <br />Ms. Rachel Juba, City Planner <br />City of Hugo <br />14669 Fitzgerald Avenue North <br />Hugo, MN 55038 <br />Re: Preliminary Site Plan Review <br />Xcel Energy Gas Training Facility — Phase 4 <br />WSB Project No. 010372-000 <br />Dear Ms. Juba: <br />We have reviewed the preliminary site plan and drainage analysis/calculations submittal for the above - <br />referenced project. In particular, we have reviewed the following plans related to this particular request: <br />• Plan set (8 sheets) dated June 12, 2017, prepared by RSP Architects and Rehder & <br />Associates <br />• Storm Water Management Calculations dated June 12, 2017, prepared by Rehder & <br />Associates <br />Based on the review of the application materials, we offer the following comments related to this <br />application: <br />General <br />1. Phase 4 improvements include construction of a future 12,000 square foot substation building, <br />construction of a 0.91 acre gas training site, and the associated bituminous driveway extension to <br />match into previous phases of this project. A lot combination is proposed to eliminate the northern <br />property line and combine with the adjacent parcel to the north, as both parcels are owned by Xcel <br />Energy. Stormwater basins for pretreatment and infiltration are proposed to manage stormwater <br />runoff on site. <br />The project site was previously approved for a total of 50,000 square feet of building area. After the <br />proposed improvements, the new building area totals 53,000 square feet (plus small house <br />simulators). From a stormwater perspective, the increase in building area is already taken into <br />account in the new impervious totals, and should not negatively affect the site's overall drainage. <br />Utilities <br />3. No additional site utility work for water or sanitary sewer will be needed beyond what has been <br />proposed for previous phases of this project. <br />Stormwater Management <br />4. The stormwater treatment facilities approved under Phase 1 have been designed to treat the runoff <br />for up to the Phase 3 improvements. <br />5. The Phase 4 improvements include an increase in impervious area of 1.03 acres (0.64 acres current <br />& 0.39 acres future). The applicant states that the existing pretreatment basin and infiltration basin <br />have the capacity to treat an additional 0.30 acres of impervious area. We are requesting that the <br />applicant complete an as -built (or pond survev) of the existinci infiltration/pretreatment basins to <br />confirm the available storage. <br />Building a legacy —your legacy. <br />Equal Opportunity Employer I wsbeng.com <br />K:1010372.0001AdminTocs\LTR-rjuba-Xcel Energy Training 080217.do <br />
The URL can be used to link to this page
Your browser does not support the video tag.