My WebLink
|
Help
|
About
|
Sign Out
Home
2017.08.07 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2017 CC Packets
>
2017.08.07 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2017 3:03:17 PM
Creation date
8/8/2017 2:53:08 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
8/7/2017
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Rachel Juba <br />August 2, 2017 <br />Page 2 <br />6. The remaining 0.73 acres of impervious area will be treated with the construction of a new <br />pretreatment and infiltration basin located in the northwest portion of the site. Staff will continue to <br />work with the applicant on the size and location of the stormwater facilities on site and determine if it <br />makes sense to expand the existing basin rather than creating an additional basin. <br />7. The site is within the drainage area of the Bald Eagle Industrial Park pond project completed when <br />the Industrial Park was developed. As a result, a portion of the rate control and treatment <br />requirements are met. The RCWD rules have changed since the Industrial Park was developed, and <br />the volume reduction requirement will still apply to this site, as well as providing storage for larger <br />storm events. <br />8. The proposed infiltration basin should be able to contain the 100 -year storm event without <br />overtopping the overflow spillway. A storm sewer outlet should be provided to avoid erosion at the <br />overflow. Please modify the basin according to the notes provided on the attached redlined site plan. <br />Wetlands <br />9. No wetland impacts are proposed as part of the Phase 4 improvements. <br />Thank you for the opportunity to provide comments on this project. If you have any questions, please do <br />not hesitate to contact me at 651-286-8463. <br />Sincerely, <br />WSB & Associates, Inc. <br />Mark Erichson, PE <br />City Engineer <br />cc: Steve Duff, Senior Engineering Technician (email only) <br />Stephanie Hatten, Water Resource Engineer (email only) <br />
The URL can be used to link to this page
Your browser does not support the video tag.