Ms. Rachel Juba <br />August 2, 2017 <br />Page 2 <br />6. The remaining 0.73 acres of impervious area will be treated with the construction of a new <br />pretreatment and infiltration basin located in the northwest portion of the site. Staff will continue to <br />work with the applicant on the size and location of the stormwater facilities on site and determine if it <br />makes sense to expand the existing basin rather than creating an additional basin. <br />7. The site is within the drainage area of the Bald Eagle Industrial Park pond project completed when <br />the Industrial Park was developed. As a result, a portion of the rate control and treatment <br />requirements are met. The RCWD rules have changed since the Industrial Park was developed, and <br />the volume reduction requirement will still apply to this site, as well as providing storage for larger <br />storm events. <br />8. The proposed infiltration basin should be able to contain the 100 -year storm event without <br />overtopping the overflow spillway. A storm sewer outlet should be provided to avoid erosion at the <br />overflow. Please modify the basin according to the notes provided on the attached redlined site plan. <br />Wetlands <br />9. No wetland impacts are proposed as part of the Phase 4 improvements. <br />Thank you for the opportunity to provide comments on this project. If you have any questions, please do <br />not hesitate to contact me at 651-286-8463. <br />Sincerely, <br />WSB & Associates, Inc. <br />Mark Erichson, PE <br />City Engineer <br />cc: Steve Duff, Senior Engineering Technician (email only) <br />Stephanie Hatten, Water Resource Engineer (email only) <br />