My WebLink
|
Help
|
About
|
Sign Out
Home
2017.10.02 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2017 CC Packets
>
2017.10.02 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2017 1:39:53 PM
Creation date
10/4/2017 9:26:14 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
10/2/2017
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
209
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
".-i <br />&Associates, Inc. Infrastructure ■ Engineering • Planning ■ Construction 701 Xenia Avenue South <br />Suite 300 <br />Minneapolis, MN 55416 <br />Tel: 763-541-4800 <br />Fax: 763-541-1700 <br />September 27, 2017 <br />Ms. Rachel Juba <br />City Planner <br />City of Hugo <br />14669 Fitzgerald Avenue North <br />Hugo, MN 55038 <br />Re: Final Plat Review <br />Adelaide Landing <br />WSB Project No. 010451-000 <br />Dear Ms. Juba: <br />We have reviewed the final plat submittal for the above -referenced project. In particular, we <br />have reviewed the following plans related to this particular request: <br />• Adelaide Landing Final Plat prepared by Westwood Professional Services. <br />• Grading Drainage and Erosion Control Plans dated 09/22/17 <br />• Construction Plans for Sanitary Sewer, Watermain, Storm Sewer, and Streets dated <br />09/22/17 <br />• Storm Sewer Design dated 09/21/17 <br />Based on the review of the final plat documents, we offer the following comments related to this <br />application: <br />Final Plat <br />1. The final plat is consistent with the preliminary plat documents, and the appropriate <br />drainage/utility easements have been provided within the plat area itself. <br />2. Outlots should contain drainage and utility easements over them and right of way should be <br />provided to accommodate the future roundabout consistent with information provided to the <br />developer. <br />Development A -t reement <br />1. There are a number of development fees outlined within the City's Fee Schedule that will <br />become due as part of the final plat. The Development Fees are included within Exhibit C of the <br />Development Agreement. <br />C..-!Users!R.,WJubaUppDamlL-..Mics AWlndoK iTempoy Internet FlesIConrent Outlook104F7=2D L7R-rjuba-Adelaid, L—dingFP-09271Zd- <br />
The URL can be used to link to this page
Your browser does not support the video tag.