My WebLink
|
Help
|
About
|
Sign Out
Home
2017.10.02 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2017 CC Packets
>
2017.10.02 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2017 1:39:53 PM
Creation date
10/4/2017 9:26:14 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
10/2/2017
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
209
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Rachel Juba <br />August 12, 2015 <br />Page 2 <br />2. The stormwater reuse system will be located within lot -line drainage and utility easements, <br />roadway right of way, and some Outlots. The system will be owned and operated by the <br />Homeowners Association, and the City will have access to the system as needed for monitoring <br />and operation. A credit based on the anticipated reduction in water demand has been included as <br />part of the Development Agreement. <br />3. The developer is responsible to pay for 44% of the costs to reconstruct 130th Street. The <br />developer is required to pay for 1/3 of their share of the cost to reconstruct 130th Street with each <br />of the first three plats. <br />Grading, Street, and Utilih Plans <br />1. We are working directly with the applicant's engineer to finalize the grading, street, and utility <br />construction plans, specifications, and details. We will issue the drainage permit and <br />construction plan approvals once the remaining issues have been resolved. We do not expect that <br />any remaining plan changes will have a significant impact on the final plat. <br />2. We are coordinating the future reconstruction of 130th Street with the applicants engineer to <br />ensure adequate right of way is provided and other elements are coordinated appropriately. <br />Thank you for the opportunity to provide comments on this project. If you have any questions, <br />please do not hesitate to contact me at 651-286-8463. <br />Sincerely, <br />WSB & Associates, Inc. <br />Mark Erichson, PE <br />City Engineer <br />cc: Scott Anderson, Public Works Director (email only) <br />Steve Duff, Senior Engineering Technician (email only) <br />Katy Thompson, Water Resource Engineer (email only) <br />Stephanie Hatten, Water Resource Engineer (email only) <br />Steph Griffin, Excelsior Group (email only) <br />John Bender, Westwood Professional Services (email only) <br />C.lUsemLPR chel.JubaUppl7ataUL callMlcmwj?lffindox iTenipomryrntemet File lContenGOutlooklO4F75ADIIL7R-,juba-Adelaide Landing FP-09271Zd- <br />
The URL can be used to link to this page
Your browser does not support the video tag.