My WebLink
|
Help
|
About
|
Sign Out
Home
2017.11.06 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2017 CC Packets
>
2017.11.06 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2017 4:28:56 PM
Creation date
11/2/2017 4:21:50 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
11/6/2017
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Muramatsu CUP <br />4. PARKING EVALUATION: <br />There are a variety of uses occurring within the units of the property. Staff evaluated the parking <br />for the approximately 6,500 square foot building being used half as manufacturing and half as <br />warehouse. Based on our ordinance, one parking space per 1,500 square feet of floor area is <br />required for warehousing and one parking space per 500 square feet of floor area is required for <br />manufacturing. For the 6,500 square foot building, approximately nine spots are required. With <br />the addition of a retail component encompassing 400 square feet of the applicant's unit, two <br />additional parking spaces would be required. <br />The west and east side of the building currently have space for approximately 36 parking spots. <br />There is also some on street parking available on Francesca Avenue for any overflow parking. It <br />is in staff's opinion that the parking is adequate for the general use of the building and that <br />adding a small retail component to the building will not adversely affect the parking needs on <br />site. <br />4. LEVEL OF CITY DISCRETION IN DECISION-MAKING: <br />The City's discretion in approving or denying a conditional use permit is limited to whether or <br />not the proposed application meets the standards outlined in the Zoning Ordinance. If it meets <br />these standards, the City must approve the conditional use permit. <br />6. CONTEXT: <br />A. Surrounding Land Use and Zoning <br />The property is within the Peloquin Industrial Park and is currently zoned General Industrial (I- <br />3). The property is guided for Industrial (IND) in the 2030 Land Use Plan. The surrounding <br />properties are also zoned General Industrial (I-3) and are generally occupied by industrial <br />business users. <br />B. Natural Characteristics of Site <br />The property is approximately 0.77 acres and is relatively flat. The building on the site is <br />approximately 6,500 square feet and has four separate units within it. The property has a gravel <br />parking/loading area surrounding the west, south, and east sides of the building. <br />7. ANALYSIS OF CONDITIONAL USE PERMIT: <br />A. Conditional Use Permit <br />The City Council must review the application for a conditional use permit with the standards <br />provided in Section 90-37 of Comprehensive Land Use Regulations. Staff used these standards <br />to review the application and found that the request meets all applicable standards as follows: <br />1. The proposed use is permissible by law. <br />
The URL can be used to link to this page
Your browser does not support the video tag.