Laserfiche WebLink
between multi-level townhome buildings. This is consistent with other townhome projects in <br />Hugo. <br />The maximum development density for a PUD in the R-3 zoning district is 4 units per 1 acre. <br />The applicant is proposing a residential net density of 3 units per 1 acre, which fits the <br />requirements of a PUD. Although the applicant is requesting flexibility on lot sizes and <br />setbacks, the density meets the ordinance standards. <br />The shoreland district comes in effect for all homes located within 1000 feet of the ordinary <br />high-water (OHW) level of Oneka Lake. Oneka Lake is classified as a natural environment lake. <br />The City's shoreland overlay district ordinance requires 20,000 square foot minimum lot size, <br />125 -foot minimum lot width, maximum 25 -foot building height, and maximum 25 percent <br />impervious surface coverage for non -riparian lots. The proposed lots do not meet the <br />requirements, but flexibility may be allowed with a PUD. The DNR PUD standards also apply to <br />this development and the applicant will be required to demonstrate they have satisfied the <br />requirements. It should be noted that all of the lots shown on the sketch plan are non -riparian lots <br />as the applicant has retained public open space and a trail adjacent to the lake. <br />Detailed review of any flexibility would be required as part of the PUD General Plan review. <br />In exchange for the proposed PUD, the sketch plan offers a proposed trail along the road and a <br />connection that will link to the existing trail in the Oneka Ponds development. The project will <br />offer additional sidewalk connections within the development, as well. The plan shows open <br />space along Oneka Lake with multi -use trails and a dock extending into Oneka Lake. The <br />applicant has indicated that the trails and dock would be public. <br />Although the applicant has done a good job incorporating public uses within the development, <br />more detail on how the applicant exceeds City standards and meets the requirements of a PUD <br />will be required with the Preliminary Plat and PUD General Plan. <br />Phasing <br />It's unclear how many phases there will be with the development, however the applicant is <br />proposing what would be completed in the first phase. Phase one includes 44 townhome lots on <br />the northern portion of the site with a connection to Highway 61. Phase one also includes 71 <br />residential lots on the southern portion of the site with a connection to Goodview Trail. The <br />southern portion of phase one would not have a connection to Highway 61. Because the <br />proposed phasing includes a substantial portion of the site being developed with the majority of <br />phase one traffic traveling south on Goodview Avenue and Goodview Trail, it is in staff's <br />opinion that all lots in phase one should include a connection and access out to Highway 61. <br />Equally as important, are the utilities in regards to the phasing plan. It is not clear how the <br />applicant intends to serve the townhomes on the north side with Phase 1. The phasing plan <br />should be revised to take into consideration the construction of utilities. <br />