My WebLink
|
Help
|
About
|
Sign Out
Home
2017.12.18 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2017 CC Packets
>
2017.12.18 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2017 3:45:54 PM
Creation date
12/14/2017 3:37:52 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
12/18/2017
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Statement of Work <br />• Provide timely and appropriate responses to zedlT Solutions requests for information. <br />• Arrange for the availability of appropriate Agency staff to read through the Best Practice Template Datasheet <br />documents. Agency staff must review the datasheet documents and indicate which record types and data <br />fields the project team will disable/turnoff. <br />• Agency staff must provide record type and data field feedback based on the project plan timeline agreed to <br />by zedlT Solutions and the Agency. <br />• Schedule appropriate Agency staff participants and meeting locations for activities. <br />Acceptance Criteria: <br />• Confirmation of turned off/disabled record types and data fields by logging into Civic Platform with valid <br />credentials. <br />DELIVERABLE 5: WORKFLOW PROCESS AND INSPECTION GROUP DISTINCT UPDATES <br />zedlT Solutions will provide up to thirty 30 distinct updates to the existing workflow processes and up to twenty 20 <br />distinct updates to the existing inspection groups that are configured in the deployed Best Practice Templates. <br />Using the Best Practice Template Datasheets, the Agency will indicate which Workflow Process and/or Inspection <br />Groups to update. Distinct workflow process updates include renaming, adding or removing a workflow task or <br />workflow task status result. Distinct inspection group updates include renaming, adding or removing inspection types, <br />inspection status results, checklist items or checklist status results. Each edit, update or removal of a workflow task, <br />workflow status result, inspection type, inspection status result, checklist item or checklist status result is considered a <br />distinct single action change. <br />Requests to build new workflows and inspection groups for the Best Practice Template record types is not in scope of <br />this services package. If required, zedlT can scope the level of effort as a separate deliverable item, which may result <br />in a Change Order. <br />In terms of specific output, the following will be executed for this deliverable: <br />zedlT Solutions Responsibilities: <br />• Provide timely and appropriate responses to Agency's request for information. <br />• Provide the Agency with the Best Practice Template Datasheet documents <br />• Update the workflow processes (up to 30) and/or inspection groups (up to 20) in the environment, based on <br />the Agency feedback. <br />• Conduct meetings via email, web conference and/or phone to demonstrate the updated workflow process <br />and/or inspection groups in environment, based on Agency feedback. <br />Apencv Responsibilities: <br />• Provide timely and appropriate responses to zedlT's requests for information. <br />• Arrange for the availability of appropriate Agency staff to read through the Best Practice Template Datasheet <br />documents. <br />• Agency staff must provide a list of distinct workflow process and inspection group updates based on zedlT <br />Solutions and the Agency agreed upon project plan timeline. <br />• Agency staff must review and test all workflow processes and inspection groups configuration and provide <br />feedback to zedlT Solutions based on the agreed upon project plan timeline. <br />• Schedule appropriate Agency staff participants and meeting locations for activities. <br />Acceptance Criteria: <br />9 2015 Accela Inc. <br />Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.