My WebLink
|
Help
|
About
|
Sign Out
Home
2018.02.05 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2018 CC Packets
>
2018.02.05 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2019 1:50:52 PM
Creation date
2/1/2018 2:52:46 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
2/5/2018
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
427
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. EXECUTIVE SUMMARY <br />The Oneka Lake Boulevard and Harrow Avenue Street Improvement Project consists of roadway <br />improvements on Oneka Lake Boulevard North, 157th Street North, and Harrow Avenue North. A map <br />illustrating the project location is shown on Figure 1 in Appendix A. <br />Improvements throughout the project include bituminous pavement reclamation, minor subgrade <br />corrections, and minor drainage improvements, with grading and culvert replacement only as necessary <br />to address isolated drainage issues. Three roadway options were considered during preliminary design. <br />The base roadway option considered is bituminous reclamation and paving at the existing widths; the <br />second option, Alternate 1, is bituminous reclamation and paving with shoulder widening; and the third <br />option included in this report, Alternate 2, is the extension of watermain and sanitary sewer from Green <br />Avenue 800 feet to the east, and south from Goodview Avenue across Oneka Lake Boulevard. <br />The cost of the street improvement project is estimated at $1,180,000 — $1,290,000. The estimated cost <br />for the sanitary sewer and watermain improvements is $294,000. This includes a 10% contingency <br />and 25% indirect costs. Funding for the project will consist of special assessments, City Street CIP <br />Funds, and State Aid Funds. <br />The project schedule proposed includes construction beginning in June 2018, with final completion by the <br />fall of 2018. <br />This project is feasible, necessary, and cost-effective from an engineering standpoint and should be <br />constructed as proposed herein. <br />Feasibility Report <br />Oneka Lake Boulevard and Harrow Avenue <br />Street Improvement Project <br />City of Hugo, MN <br />WSB Project No. R-010893-000 <br />Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.