My WebLink
|
Help
|
About
|
Sign Out
Home
2018.02.05 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2018 CC Packets
>
2018.02.05 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2019 1:50:52 PM
Creation date
2/1/2018 2:52:46 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
2/5/2018
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
427
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. INTRODUCTION <br />2.1 Authorization <br />On November 6, 2017, the Hugo City Council authorized the preparation of a feasibility report for the <br />Oneka Lake Boulevard and Harrow Avenue Street Improvement Project. <br />2.2 Scope <br />This feasibility report includes street improvements and minor drainage improvements along the following <br />roadways: <br />■ Oneka Lake Boulevard North from Goodview Avenue North to Harrow Avenue North <br />■ Harrow Avenue North from Oneka Lake Boulevard North to 165th Street North <br />■ 157th Street North from Harrow Avenue North to 300 feet east <br />2.3 Data Available <br />Information and materials used in the preparation of this report include the following: <br />■ City of Hugo Capital Improvement Plan <br />■ City of Hugo Assessment Policy Manual <br />• City of Hugo Property Index Records <br />• City of Hugo Topography Maps <br />■ Pavement Cores/Soil Borings <br />■ Topographic Survey <br />■ Field Observations of the Area <br />2.4 Project History <br />The Oneka Lake Boulevard and Harrow Avenue Street Improvement Project is identified in the City's <br />Capital Improvement Plan to address the poor condition of the roadway. <br />The City held a neighborhood meeting on October 19, 2017, to receive input on the project. The majority <br />of the meeting attendees stated there was a need for the project and supported the proposed <br />improvements. Many in attendance expressed concern regarding the assessments; opposition to trails, <br />walks, or widening; and concern for disturbance area. <br />Feasibility Report <br />Oneka Lake Boulevard and Harrow Avenue <br />Street Improvement Project <br />City of Hugo, MN <br />WSB Project No. R-010893-000 <br />Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.