My WebLink
|
Help
|
About
|
Sign Out
Home
2018.02.05 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2018 CC Packets
>
2018.02.05 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2019 1:50:52 PM
Creation date
2/1/2018 2:52:46 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
2/5/2018
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
427
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.6 Construction Access/Staging <br />The contractor will be responsible for providing access to all properties throughout the project. The <br />proposed methods of pavement rehabilitation will typically allow residents to drive on the roadway surface <br />during construction. Adequately signed detours will be identified to direct traffic around the construction <br />zones and notify users of the increased truck and construction activity. Detours will be used only if <br />absolutely necessary to ensure the safety of residents and construction workers alike. <br />Feasibility Report <br />Oneka Lake Boulevard and Harrow Avenue <br />Street Improvement Project <br />City of Hugo, MN <br />WSB Project No. R-010893-000 <br />Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.