Laserfiche WebLink
O inion of Probable Cost <br />WSB Project: Oneka Lake Blvd & Harrow Avenue Improvement Project Design By: LME <br />Project Location: City of Hugo Checked By: JLS <br />WSB Project No: 10893-000 Date: 2/5/2018 <br />Item No. <br />MN/DOT <br />Specification No. <br />Description <br />Unit <br />Estimated <br />Total Quantity <br />Estimated Unit <br />Price <br />Estimated Total Cost <br />SCHEDULE ALT 2B - WATERMAIN IMPROVEMENTS Marier Property) <br />17 <br />2021.501 <br />MOBILIZATION LUMP SUM <br />CONNECT TO EXISTING WATER MAIN EACH <br />8" GATE VALVE & BOX EACH <br />8" WATER MAIN DUCTILE IRON CL 52 LIN FT <br />1 <br />$1,000.00 <br />$1,000.00 <br />18 <br />2504.602 <br />1 <br />$1,500.00 <br />$1,500.00 <br />19 <br />2504.602 <br />2 <br />$2,000.00 <br />$4,000.00 <br />20 <br />2504.603 <br />40 <br />$50.00 <br />$2,000.00 <br />21 <br />2504.608 <br />DUCTILE IRON FITTINGS POUND <br />60 <br />$8.00 <br />$480.00 <br />TOTAL $8,980.00 <br />CONTINGENCY TOTAL (10%) $898.00 <br />SUBTOTAL TOTAL $9,878.00 <br />INDIRECT COST TOTAL (25%) $2,469.50 <br />TOTAL $13,000.00 <br />SCHEDULE ALT 2B - WATERMAIN IMPROVEMENTS Graves Property) <br />22 <br />2021.501 <br />MOBILIZATION LUMP SUM 1 <br />$5,000.00 $5,000.00 <br />23 <br />2504.602 <br />8" GATE VALVE & BOX EACH 1 <br />$2,000.00 $2,000.00 <br />24 <br />2504.602 <br />12" GATE VALVE & BOX EACH 2 <br />$3,500.00 $7,000.00 <br />25 <br />2504.602 <br />HYDRANT EACH 1 <br />$4,000.00 $4,000.00 <br />26 <br />2504.602 <br />6" GATE VALVE & BOX EACH 1 <br />$1,500.00 $1,500.00 <br />27 <br />2504.603 <br />6" WATER MAIN DUCTILE IRON CL 52 LIN FT 5 <br />$40.00 $200.00 <br />28 <br />2504.603 <br />8" WATER MAIN DUCTILE IRON CL 52 LIN FT 40 <br />$50.00 $2,000.00 <br />29 <br />2504.603 <br />12" WATER MAIN DUCTILE IRON CL 52 LIN FT 900 <br />$70.00 $63,000.00 <br />30 <br />2504.608 <br />DUCTILE IRON FITTINGS POUND 876 <br />$8.00 $7,008.00 <br />TOTAL $91,708.00 <br />CONTINGENCY TOTAL (10%) $9,170.80 <br />SUBTOTAL TOTAL $100,878.80 <br />INDIRECT COST TOTAL (25%) $25,219.70 <br />TOTAL $127,000.00 <br />GRAND TOTAL WATERMAIN: $140,000.00 <br />GRAND TOTAL SANITARY: $154,000.00 <br />GRAND TOTAL: $294,000.00 <br />K:\010893-000\Quantity\Preliminary\010893-000_0 PC_LM E_020518 <br />