Laserfiche WebLink
REFER TO SITE GRADING PLAN <br />FOR SLOPE. PLACE THREE PINS <br />EVERY 2'-0", SPACING _ <br />EQUALLY. SOD SHALL BE <br />COMPOSED OF TWO VARIETIES <br />MINIMUM OF FESCUE GRASS. <br />SUBGRADE <br />1 I SODDING WITH PINS <br />L2 I SCALE: 3/4" = V-0" <br />TWO STRANDS OF WIRE <br />1 " X 4" X 10" WHITE <br />WOOD FLAG <br />REFER TO LANDSCAPE PLAN — <br />FOR GROUND COVER TYPE <br />AND LOCATIONS. PROVIDE 3" <br />SHREDDED CYPRESS MULCH <br />OVER BLACK VISQUEEN VAPOR <br />BARRIER <br />EXTENTS OF PLANTING / <br />BERM TO HOLD WATER <br />PLANTING: <br />REFER TO PLANTING SCHEDULE FOR TYPE. <br />SET TREE LEVEL AND PLUM. STRAIGHTEN <br />AFTER SETTLEMENT IF NEEDED. <br />ENCASE WIRE AROUND TRUNK IN BLACK <br />RUBBER. MOVE UP ABOVE EQUAL TO 1/2 TC <br />1/3 OF THE HEIGHT OF TREE. <br />� J <br />TWO STRANDS OF WIRE <br />—T 7 — _ TRUNK WRAP <br />� I <br />SET TREE WITH TOP 1/3 OF ROOT ABOVE <br />FINISH GRADE. <br />2" X 2" X 10" WOOD STAKES BURY BELOW <br />FINISH GRADE <br />r� <br />LAWN <br />DECIDUOUS <br />:3] TREE PLANTING <br />L2 I SCALE: 3/4" = 1'-0" <br />PREPARED PLANTING MIXTURE. <br />I <br />COMPACTED PLANTING <br />i <br />SUB GRADE <br />TREES 6'-0" IN HEIGHT OR LESS SHALL BE STAKED <br />PREPARED PLANTING MIXTURE. <br />EXTENTS OF PLANTING BERM TO HOLD WATER <br />TREES TALLER THAN T-0" MUST BE TIED. <br />3" SHREDDED CYPRESS MULCH <br />OVER BLACK VISQUEEN VAPOR <br />BARRIER. -- LAWN <br />4" BLACK POLY <br />VINYL EDGING <br />nnuLcH <br />:2] LANDSCAPE FABRIC <br />L2 ' SCALE: 3/4" = V-0" <br />REFER TO LANDSCAPE PLAN — <br />FOR GROUND COVER TYPE <br />AND LOCATIONS. PROVIDE 3" <br />SHREDDED CYPRESS MULCH <br />OVER BLACK VISQUEEN VAPOR <br />BARRIER <br />III -III III II <br />11III=III I <br />Illllllllll - - 1111111 <br />-1I II I I=1I I_I IIIA I� <br />-I 1I- <br />4 � SHRUB PLANTING <br />L2 J SCALE: 3/4" = 1'-0" <br />PLANTING: <br />REFER TO PLANTING <br />SCHEDULE FOR TYPE <br />4" BLACK POLY VINYL <br />EDGING <br />LAWN <br />-III-1IIII-III <br />I II Ii - <br />1 <br />PREPARED PLANTING <br />MIXTURE.LAWN <br />SUB GRADE <br />ui <br />� � I <br />O <br />Lu <br />22 <br />I <br />O / <br />EVERGREEN <br />75] TREE PLANTING <br />L2 j SCALE: 3/4" = 1'-0" <br />GENERAL NOTES: <br />A. REFER TO PROJECT MANUAL FOR ADDITIONAL REQUIREMENTS. <br />B. COORDINATE WORK WITH OTHER SITE RELATED DEVELOPMENT <br />DRAWINGS. <br />PLANTING: <br />REFER TO PLANTING SCHEDULE <br />FOR TYPE. <br />SET TREE LEVEL AND PLUM. <br />STRAIGHTEN AFTER SETTLEMENT <br />IF NEEDED. <br />ENCASE WIRE AROUND TRUNK IN <br />BLACK RUBBER. MOVE UP ABOVE <br />EQUAL TO 1/2 TO 1/3 OF THE <br />HEIGHT OF TREE. <br />SET TREE WITH TOP 1/3 OF ROOT <br />ABOVE FINISH GRADE. <br />REFER TO LANDSCAPE PLAN FOR <br />GROUND COVER TYPE AND <br />LOCATIONS. PROVIDE 3" <br />SHREDDED CYPRESS MULCH OVER <br />BLACK VISQUEEN VAPOR BARRIER <br />2" X 2" X 10" WOOD STAKES <br />BURY BELOW FINISH GRADE <br />LAWN <br />I I I II II II I�I I L I I i- <br />I III III <br />I III IIS <br />III Ili <br />PREFERRED SOIL <br />COMPACTED PLANTING <br />SUB GRADE <br />DATE: 8-22-14 <br />REVISION <br />DATE: <br />L2 of 3 <br />GO L <br />T o 0 <br />�!9 N <br />O M <br />O� <br />OO <br />s. <br />N N w <br />O O O <br />00 0� ,�• <br />G� <br />ti ti = <br />C <br />C4 <br />= w (.C) <br />Net <br />O <br />- H <br />O <br />L <br />Net <br />N U) <br />a� <br />v <br />• <br />met <br />r• <br />� <br />wee <br />o0 <br />cdop.1� <br />�o <br />W2 <br />0 <br />ea ;� <br />w �oA <br />O <br />M s. <br />ti O <br />.-- rwl.� <br />DATE: 8-22-14 <br />REVISION <br />DATE: <br />L2 of 3 <br />N <br />0 <br />00 <br />co <br />O� <br />OO <br />U) Ow <br />oz <br />C <br />C4 <br />= w (.C) <br />> <br />O <br />O <br />cz� <br />N U) <br />DATE: 8-22-14 <br />REVISION <br />DATE: <br />L2 of 3 <br />