My WebLink
|
Help
|
About
|
Sign Out
Home
2018.04.02 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2018 CC Packets
>
2018.04.02 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2019 1:59:39 PM
Creation date
4/17/2018 1:38:48 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
4/2/2018
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
co <br />aN <br />I <br />I <br />1 <br />1 <br />C+.— R R, I ;-An 0— <br />14 7TH STREET N. <br />LOCAL STREET 30 M.P.H. - BITUMINOUS - CITY OF HUGO <br />33' R -O -W (NORTH PORTION) POSSIBLE EASEMENT <br />(SOUTH PORTION) VARIABLE TRAVEL SURFACE WIDTH <br />4�� <br />1 I IRRIGATION COVERAGE PLAN <br />L3 I SCALE: 1" = 20' <br />20 O 20 AO X00 <br />ORAPHIG SCALE - FEET <br />REFER TO LANDSCAPE <br />PLANS FOR PLANTINGS <br />C-1 CI]NTRAL /BUSINESS <br />V v v <br />vvv <br />J v v v <br />vvv <br />vlvv <br />vv <br />� v v <br />v v <br />J v <br />V v <br />7 v �y <br />v <br />7 v qqq// <br />CR -3 CENTRAL RESIDENTIAL <br />EXISTING <br />SHED <br />M I Gerald K. & Karla J. Mundell <br />5720 147TH Street North <br />I Hugo, MN 55038 <br />Doc. No. 3767359 <br />ICR -3 CENTRAL RESIDENTIAL <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />GENERAL NOTES: <br />A. REFER TO PROJECT MANUAL FOR ADDITIONAL <br />REQUIREMENTS. <br />B. COORDINATE WORK WITH OTHER SITE RELATED <br />DEVELOPMENT DRAWINGS. <br />C. PRIOR TO INSTALLATION, GENERAL CONTRACTOR TO <br />CONFIRM THAT LIGHT POLES, LANDSCAPING AND <br />UTILITIES DO NOT CONFLICT WITH SIGN LOCATION <br />SHOWN. IF ANY POTENTIAL CONFLICT IS DISCOVERED, <br />GENERAL CONTRACTOR TO CONTACT THE O'REILLY <br />PROJECT ADMINISTRATOR BEFORE PROCEEDING. <br />COVERAGE DETAIL: <br />1. IRRIGATION HEAD SHALL BE PLACED TO PROVIDE 100% <br />OVERLAP HEAD-TO-HEAD COVERAGE. <br />2. A RAIN SENSOR AND ANTI -FREEZE ASSEMBLY SHALL BE <br />INSTALLED ON IRRIGATION SYSTEM. <br />3. THE IRRIGATION CONTRACTOR SHALL BE RESPONSIBLE <br />FOR PROVIDING A COMPLETE AND OPERABLE SYSTEM <br />FOR THE IRRIGATION OF ALL LANDSCAPE PLANTING(S) <br />AND DESIRED COVERAGE AREAS ON SITE. <br />4. THE IRRIGATION CONTRACTOR IS FULLY RESPONSIBLE <br />FOR THE WORK UNTIL OWNER GIVES FINAL <br />ACCEPTANCE. <br />5. NO WATER TO BE SPRAYED ON SIDEWALK, PARKING <br />LOT, ROAD OR ADJACENT PROPERTY. ADJUST ARC AND <br />RADIUS OF REQUIRED SPRINKLERS AS NEEDED. <br />6. ALL CIRCUIT PIPE IS TO BE CLASS 160 PVC OR HIGHER <br />GRADE. <br />7. ALL MAIN FITTINGS SHALL BE REINFORCED WITH <br />2000PSI POURED CONCRETE THRUST BLOCKS. <br />8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR <br />CONSTRUCTING THE REQUIRED SYSTEM IN COMPLETE <br />ACCORDANCE WITH ALL APPLICABLE CODES, <br />ORDINANCES, AND LAWS. ANY MODIFICATION MADE <br />AFTER INSTALLATION TO CONFORM WITH SAID CODES, <br />LAWS AND ORDINANCES SHALL BE PERFORMED AT <br />CONTRACTORS EXPENSE AT NO ADDITIONAL COST TO <br />OREILLY. <br />LANDSCAPE <br />SYMBOLS LEGEND <br />REFER TO SURVEY FOR EXISTING CONDITION SYMBOLS <br />LEGEND <br />NEW BUILDING CONSTRUCTION <br />�' <br />d <br />vvvvvvvvvv <br />U)0 W <br />z <br />v v v v v v v v v <br />v vvvvvvvvv. <br />v. <br />w U) O <br />AREA OF DESIRED IRRIGATION <br />° <br />d <br />COVERAGE <br />D <br />NEW CONCRETE PAVING BLOCK <br />1111110111111 <br />O <br />2 W (.C) <br />I-�N <br />Q <br />d <br />a <br />d <br />dd <br />as <br />U)z 00 <br />d <br />d <br />O <br />a <br />d4 <br />14 7TH STREET N. <br />LOCAL STREET 30 M.P.H. - BITUMINOUS - CITY OF HUGO <br />33' R -O -W (NORTH PORTION) POSSIBLE EASEMENT <br />(SOUTH PORTION) VARIABLE TRAVEL SURFACE WIDTH <br />4�� <br />1 I IRRIGATION COVERAGE PLAN <br />L3 I SCALE: 1" = 20' <br />20 O 20 AO X00 <br />ORAPHIG SCALE - FEET <br />REFER TO LANDSCAPE <br />PLANS FOR PLANTINGS <br />C-1 CI]NTRAL /BUSINESS <br />V v v <br />vvv <br />J v v v <br />vvv <br />vlvv <br />vv <br />� v v <br />v v <br />J v <br />V v <br />7 v �y <br />v <br />7 v qqq// <br />CR -3 CENTRAL RESIDENTIAL <br />EXISTING <br />SHED <br />M I Gerald K. & Karla J. Mundell <br />5720 147TH Street North <br />I Hugo, MN 55038 <br />Doc. No. 3767359 <br />ICR -3 CENTRAL RESIDENTIAL <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />GENERAL NOTES: <br />A. REFER TO PROJECT MANUAL FOR ADDITIONAL <br />REQUIREMENTS. <br />B. COORDINATE WORK WITH OTHER SITE RELATED <br />DEVELOPMENT DRAWINGS. <br />C. PRIOR TO INSTALLATION, GENERAL CONTRACTOR TO <br />CONFIRM THAT LIGHT POLES, LANDSCAPING AND <br />UTILITIES DO NOT CONFLICT WITH SIGN LOCATION <br />SHOWN. IF ANY POTENTIAL CONFLICT IS DISCOVERED, <br />GENERAL CONTRACTOR TO CONTACT THE O'REILLY <br />PROJECT ADMINISTRATOR BEFORE PROCEEDING. <br />COVERAGE DETAIL: <br />1. IRRIGATION HEAD SHALL BE PLACED TO PROVIDE 100% <br />OVERLAP HEAD-TO-HEAD COVERAGE. <br />2. A RAIN SENSOR AND ANTI -FREEZE ASSEMBLY SHALL BE <br />INSTALLED ON IRRIGATION SYSTEM. <br />3. THE IRRIGATION CONTRACTOR SHALL BE RESPONSIBLE <br />FOR PROVIDING A COMPLETE AND OPERABLE SYSTEM <br />FOR THE IRRIGATION OF ALL LANDSCAPE PLANTING(S) <br />AND DESIRED COVERAGE AREAS ON SITE. <br />4. THE IRRIGATION CONTRACTOR IS FULLY RESPONSIBLE <br />FOR THE WORK UNTIL OWNER GIVES FINAL <br />ACCEPTANCE. <br />5. NO WATER TO BE SPRAYED ON SIDEWALK, PARKING <br />LOT, ROAD OR ADJACENT PROPERTY. ADJUST ARC AND <br />RADIUS OF REQUIRED SPRINKLERS AS NEEDED. <br />6. ALL CIRCUIT PIPE IS TO BE CLASS 160 PVC OR HIGHER <br />GRADE. <br />7. ALL MAIN FITTINGS SHALL BE REINFORCED WITH <br />2000PSI POURED CONCRETE THRUST BLOCKS. <br />8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR <br />CONSTRUCTING THE REQUIRED SYSTEM IN COMPLETE <br />ACCORDANCE WITH ALL APPLICABLE CODES, <br />ORDINANCES, AND LAWS. ANY MODIFICATION MADE <br />AFTER INSTALLATION TO CONFORM WITH SAID CODES, <br />LAWS AND ORDINANCES SHALL BE PERFORMED AT <br />CONTRACTORS EXPENSE AT NO ADDITIONAL COST TO <br />OREILLY. <br />LANDSCAPE <br />SYMBOLS LEGEND <br />REFER TO SURVEY FOR EXISTING CONDITION SYMBOLS <br />LEGEND <br />NEW BUILDING CONSTRUCTION <br />° a <br />AREA OF CONCRETE <br />vvvvvvvvvv <br />U)0 W <br />z <br />v v v v v v v v v <br />v vvvvvvvvv. <br />v. <br />w U) O <br />AREA OF DESIRED IRRIGATION <br />v ° v ° v ° v ° v ° v ° v ° v °'- ° -..— <br />vvvvvvvv; <br />COVERAGE <br />D <br />NEW CONCRETE PAVING BLOCK <br />1111110111111 <br />NEW LIGHT POLE LOCATION <br />2 W (.C) <br />I-�N <br />NEW FENCE CONSTRUCTION <br />NEW MASONRY ENCLOSURE <br />WE— <br />_. <br />co 1fj a <br />Lm `m <br />� N � <br />N N Qp <br />�G �C 'v <br />�y <br />w <br />Z <br />v <br />o <br />00 <br />G <br />Z <br />0 <br />a� <br />M 'rte. <br />r• c. <br />1 <br />In <br />DATE: 8-22-14 <br />REVISION <br />12-4-14 <br />DATE: <br />L3 0f 3 <br />N <br />O <br />00 <br />L0 <br />CDz <br />OC <br />U)0 W <br />z <br />w U) O <br />C� <br />2 W (.C) <br />I-�N <br />0 Z <br />U)z 00 <br />M <br />N (!) d' <br />DATE: 8-22-14 <br />REVISION <br />12-4-14 <br />DATE: <br />L3 0f 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.