My WebLink
|
Help
|
About
|
Sign Out
Home
2018.05.07 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2018 CC Packets
>
2018.05.07 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2020 3:30:59 PM
Creation date
5/4/2018 9:23:53 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
5/7/2018
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/A <br />ffYS <br />& Associates, Inn. <br />May 3, 2018 <br />Ms. Rachel Juba <br />City Planner <br />Infrastructure ■ Engineering ■ Planning ■ Construction <br />City of Hugo <br />14669 Fitzgerald Avenue North <br />Hugo, MN 55038 <br />Re: Final Plat Review <br />Adelaide Landing 2nd Addition <br />WSB Project No. 011681-000 <br />Dear Ms. Juba: <br />701 Xenia Avenue South <br />Suite 300 <br />Minneapolis, MN 55416 <br />Tel: 763-541-4800 <br />Fax: 763-541-1700 <br />We have reviewed the final plat submittal for the above -referenced project. In particular, we <br />have reviewed the following plans related to this particular request: <br />• Adelaide Landing 2nd Addition Final Plat by Westwood Professional Services <br />• Construction Plans for Sanitary Sewer, Watermain, Storm Sewer, and Streets dated <br />02/23/18 by Westwood Professional Services <br />• Storm Sewer Design dated 02/19/18 by Westwood Professional Services <br />• Revised Stormwater Reuse Irrigation Plans dated 02/28/18 by MTI Distributed <br />• Adelaide Landing 1st & 2nd Addition Grading, Drainage, and Erosion Control Plans dated <br />05/02/18 <br />Based on the review of the final plat documents, we offer the following comments related to this <br />application: <br />Final Plat <br />1. The final plat is consistent with the preliminary plat documents, and the appropriate <br />drainage/utility easements have been provided within the plat area itself. <br />2. Drainage and Utility easements shall be placed over all the outlots. <br />Development Agreement <br />3. There are a number of development fees outlined within the City's Fee Schedule that will <br />become due as part of the final plat. The Development Fees are included within Exhibit C of <br />the Development Agreement along with the second installment of the developers cost share <br />for the future reconstruction of 130th Street Improvement Project. <br />S:IUs R_Jub.T.,h,IDElELOPMENTPROJECTSIA—dSauth Adelaide LandinglAdelaide Landing2ndAdd Final Pi.al gMemo Adelaide Landing2adFP-050318.d- <br />
The URL can be used to link to this page
Your browser does not support the video tag.